23 extractive question-and-answer pairs built from 5.12 Rural Infrastructure Development Fund, published by nabard.org. Every answer is a verbatim span of text the source prints, and each row carries the passage it sits in, its offset in that passage, the source quote, the page and the location in the document, so any row can be checked against the original. 15 of the 23 pairs (65.2%) are explanatory questions and 8 restate a figure. 95.65% of rows pass the corpus quality gate.
Use the API URL with your free DD token in notebooks, scripts, and pipelines.
https://www.desidata.in/api/datasets/rural-infrastructure-development-fund-question-and-answer-dataset/downloadDataset downloads are free. For Python or API downloads, sign in once and create a free DD token; set it as DD_TOKEN or save it in your notebook's secrets. Requests are linked to your account so your download history and counts stay accurate.
# One-time install: pip install desidata
# Set DD_TOKEN in your environment first (create a free token in Profile & settings).
import desidata
df = desidata.load("rural-infrastructure-development-fund-question-and-answer-dataset")
df.head()Sign in with Google to download.
Usable for analysis, but expect some cleaning before you rely on it.
Annual Report 2015-16 by agriwelfare.gov.in - Question and Answer Dataset
Economy · 1,013 rows
Higher Education in India - Question and Answer Dataset
Economy · 1,594 rows
Gender Policy of NABARD - Question and Answer Dataset
Economy · 14 rows
ICAR Annual Report 2025-26 - Question and Answer Dataset
Economy · 1,101 rows
First 10 of 23 rows
| question | answer | context | answer_start | question_type | knowledge_quality_score | source_quote | source_page | source_location | confidence | validation_status |
|---|---|---|---|---|---|---|---|---|---|---|
| How does the project contribute to public health? | improves the overall health and well-being of the population by reducing waterborne diseases | Public Health: Access to clean drinking water is essential for public health. The project improves the overall health and well-being of the population by reducing waterborne diseases. 4. Rural Development: The project directly benefits rural areas by providing a reliable water supply, improving living standards, and fostering rural development. 5. Women Empowerment: Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities. Sr. No. Impact Parameters Numbers 1 Rural Population benefited 4.3 million 2 Villages 612 3 Towns 20 4 Non-recurring employment generation 7.00 million- man days | 90 | relationship | 0.970 | The project improves the overall health and well-being of the population by reducing waterborne diseases. | 1 | page=1,block=1 | 0.700 | valid |
| How has the project contributed to women empowerment? | Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities | Public Health: Access to clean drinking water is essential for public health. The project improves the overall health and well-being of the population by reducing waterborne diseases. 4. Rural Development: The project directly benefits rural areas by providing a reliable water supply, improving living standards, and fostering rural development. 5. Women Empowerment: Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities. Sr. No. Impact Parameters Numbers 1 Rural Population benefited 4.3 million 2 Villages 612 3 Towns 20 4 Non-recurring employment generation 7.00 million- man days | 369 | relationship | 0.970 | Women Empowerment: Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities. | 1 | page=1,block=1 | 0.700 | valid |
| How does the Budhel to Borda Bulk Pipeline project contribute to public health? | The project improves the overall health and well-being of the population by reducing waterborne diseases. | Public Health: Access to clean drinking water is essential for public health. The project improves the overall health and well-being of the population by reducing waterborne diseases. 4. Rural Development: The project directly benefits rural areas by providing a reliable water supply, improving living standards, and fostering rural development. 5. Women Empowerment: Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities. Sr. No. Impact Parameters Numbers 1 Rural Population benefited 4.3 million 2 Villages 612 3 Towns 20 4 Non-recurring employment generation 7.00 million- man days | 78 | relationship | 0.970 | Public Health: Access to clean drinking water is essential for public health. The project improves the overall health and well-being of the population by reducing waterborne diseases. 4. | 1 | page=1,block=1 | 0.700 | valid |
| How has the Budhel to Borda Bulk Pipeline project empowered women? | Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities. | Public Health: Access to clean drinking water is essential for public health. The project improves the overall health and well-being of the population by reducing waterborne diseases. 4. Rural Development: The project directly benefits rural areas by providing a reliable water supply, improving living standards, and fostering rural development. 5. Women Empowerment: Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities. Sr. No. Impact Parameters Numbers 1 Rural Population benefited 4.3 million 2 Villages 612 3 Towns 20 4 Non-recurring employment generation 7.00 million- man days | 369 | relationship | 0.970 | Women Empowerment: Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities. Sr. | 1 | page=1,block=1 | 0.700 | valid |
| What is one of the economic benefits of the Budhel to Borda Bulk Pipeline project? | The project supports agricultural activities, industries, and tourism in the region. | This expansion would significantly increase the water supply capacity, ensuring adequate water availability for both rural and urban areas. It may cater to the future demand from 612 villages of Bhavnagar, Amreli and Gir Somnath districts. Impact 1. Improved Water Security: The augmented water supply ensures enhanced water security for the Clean Water, Stronger Communities: Revitalising Rural Areas population, particularly during dry seasons or droughts. It has ensured household supply @ 100 litre per capita per day (LPCD) to rural population of 4.3 million covering 612 villages in Bhavnagar, Amreli and Gir Somnath district. Including, population of 1.55 million from urban area also benefited indirectly. 2. Economic Development: Adequate water supply is crucial for economic growth and development. The project supports agricultural activities, industries, and tourism in the region. 3. | 809 | relationship | 0.970 | Economic Development: Adequate water supply is crucial for economic growth and development. The project supports agricultural activities, industries, and tourism in the region. 3. | 1 | |||
| How does the project empower women in the region? | Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities. | Public Health: Access to clean drinking water is essential for public health. The project improves the overall health and well-being of the population by reducing waterborne diseases. 4. Rural Development: The project directly benefits rural areas by providing a reliable water supply, improving living standards, and fostering rural development. 5. Women Empowerment: Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities. Sr. No. Impact Parameters Numbers 1 Rural Population benefited 4.3 million 2 Villages 612 3 Towns 20 4 Non-recurring employment generation 7.00 million- man days | 369 | relationship | 0.970 | Women Empowerment: Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities. Sr. | 1 | page=1,block=1 | 0.700 | valid |
| How has the project empowered women in the region? | Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities. | Public Health: Access to clean drinking water is essential for public health. The project improves the overall health and well-being of the population by reducing waterborne diseases. 4. Rural Development: The project directly benefits rural areas by providing a reliable water supply, improving living standards, and fostering rural development. 5. Women Empowerment: Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities. Sr. No. Impact Parameters Numbers 1 Rural Population benefited 4.3 million 2 Villages 612 3 Towns 20 4 Non-recurring employment generation 7.00 million- man days | 369 | relationship | 0.970 | Women Empowerment: Improved access to potable water has significantly empowered women, allowing them to allocate more time and energy to productive activities. Sr. | 1 | page=1,block=1 | 0.700 | valid |
| What approach was suggested to resolve the water supply issues in the Saurashtra region? | augmenting the existing network by laying parallel pipelines between Budhel Pumping Station and Borda junction | Name of the Project: Budhel to Borda Bulk Pipeline for Drinking Water Supply Implementing Department: Narmada Water Resources Water Supply & Kalpsar Department Tranche: XXVI Total Financial Outlay: ₹3.76 billion RIDF Loan: ₹2.96 billion Year of Sanction: FY 2020-21 Year of Completion: FY 2023-24 Location of the Project: Bhavnagar, Amreli and Gir Somnath Districts, Gujarat Challenges Addressed The primary challenge faced by the region was the inadequate water supply to meet the increasing demands of the growing population, especially in the drought-prone Saurashtra region. The existing pipeline capacity was insufficient to cater to the needs of Bhavnagar, Amreli, and Gir Somnath districts. Strategies To address these challenges, the project proposed augmenting the existing network by laying parallel pipelines between Budhel Pumping Station and Borda junction. | 759 | summary | 0.970 | Strategies To address these challenges, the project proposed augmenting the existing network by laying parallel pipelines between Budhel Pumping Station and Borda junction. | 1 | |||
| What is the primary challenge that the Budhel to Borda Bulk Pipeline project aims to address? | the inadequate water supply to meet the increasing demands of the growing population, especially in the drought-prone Saurashtra region | Name of the Project: Budhel to Borda Bulk Pipeline for Drinking Water Supply Implementing Department: Narmada Water Resources Water Supply & Kalpsar Department Tranche: XXVI Total Financial Outlay: ₹3.76 billion RIDF Loan: ₹2.96 billion Year of Sanction: FY 2020-21 Year of Completion: FY 2023-24 Location of the Project: Bhavnagar, Amreli and Gir Somnath Districts, Gujarat Challenges Addressed The primary challenge faced by the region was the inadequate water supply to meet the increasing demands of the growing population, especially in the drought-prone Saurashtra region. The existing pipeline capacity was insufficient to cater to the needs of Bhavnagar, Amreli, and Gir Somnath districts. Strategies To address these challenges, the project proposed augmenting the existing network by laying parallel pipelines between Budhel Pumping Station and Borda junction. | 442 | summary | 0.970 | Name of the Project: Budhel to Borda Bulk Pipeline for Drinking Water Supply Implementing Department: Narmada Water Resources Water Supply & Kalpsar Department Tranche: XXVI Total Financial Outlay: ₹3.76 billion RIDF Loan: ₹2.96 billion Year of Sanction: FY 2020-21 Year of Completion: FY 2023-24 Location of the Project: Bhavnagar, Amreli and Gir Somnath Districts, Gujarat Challenges Addressed The primary challenge faced by the region was the inadequate water supply to meet the increasing demands of the growing population, especially in the drought-prone Saurashtra region. | ||||
| What challenge does the Budhel to Borda Bulk Pipeline project aim to address? | the inadequate water supply to meet the increasing demands of the growing population, especially in the drought-prone Saurashtra region | Name of the Project: Budhel to Borda Bulk Pipeline for Drinking Water Supply Implementing Department: Narmada Water Resources Water Supply & Kalpsar Department Tranche: XXVI Total Financial Outlay: ₹3.76 billion RIDF Loan: ₹2.96 billion Year of Sanction: FY 2020-21 Year of Completion: FY 2023-24 Location of the Project: Bhavnagar, Amreli and Gir Somnath Districts, Gujarat Challenges Addressed The primary challenge faced by the region was the inadequate water supply to meet the increasing demands of the growing population, especially in the drought-prone Saurashtra region. The existing pipeline capacity was insufficient to cater to the needs of Bhavnagar, Amreli, and Gir Somnath districts. Strategies To address these challenges, the project proposed augmenting the existing network by laying parallel pipelines between Budhel Pumping Station and Borda junction. | 442 | summary | 0.970 | Name of the Project: Budhel to Borda Bulk Pipeline for Drinking Water Supply Implementing Department: Narmada Water Resources Water Supply & Kalpsar Department Tranche: XXVI Total Financial Outlay: ₹3.76 billion RIDF Loan: ₹2.96 billion Year of Sanction: FY 2020-21 Year of Completion: FY 2023-24 Location of the Project: Bhavnagar, Amreli and Gir Somnath Districts, Gujarat Challenges Addressed The primary challenge faced by the region was the inadequate water supply to meet the increasing demands of the growing population, especially in the drought-prone Saurashtra region. |
Read straight from the file — download or use the API URL for the full dataset.
| page=1,block=1 |
| 0.700 |
| valid |
| page=1,block=1 |
| 0.700 |
| valid |
| 1 |
| page=1,block=1 |
| 0.700 |
| valid |
| 1 |
| page=1,block=1 |
| 0.700 |
| valid |