112 extractive question-and-answer pairs built from PPP OandM Mannual, published by newmangaloreport.gov.in. Every answer is a verbatim span of text the source prints, and each row carries the passage it sits in, its offset in that passage, the source quote, the page and the location in the document, so any row can be checked against the original. 53 of the 112 pairs (47.3%) are explanatory questions and 59 restate a figure. 100.00% of rows pass the corpus quality gate.
Use the API URL with your free DD token in notebooks, scripts, and pipelines.
https://www.desidata.in/api/datasets/ppp-operations-and-maintenance-manual-question-and-answer-dataset/downloadDataset downloads are free. For Python or API downloads, sign in once and create a free DD token; set it as DD_TOKEN or save it in your notebook's secrets. Requests are linked to your account so your download history and counts stay accurate.
# One-time install: pip install desidata
# Set DD_TOKEN in your environment first (create a free token in Profile & settings).
import desidata
df = desidata.load("ppp-operations-and-maintenance-manual-question-and-answer-dataset")
df.head()Sign in with Google to download.
Usable for analysis, but expect some cleaning before you rely on it.
New Mangalore Port Authority Environment Test Reports (March 2025) - Question and Answer Dataset
Economy · 25 rows
Stevedoring and Shore Handling Policy - Question and Answer Dataset
Economy · 285 rows
Half Yearly EC Compliance Report - Question and Answer Dataset
Economy · 32 rows
New Mangalore Port Authority Environment Test Reports (October 2025) - Question and Answer Dataset
Economy · 89 rows
Annual Report 2015-16 by agriwelfare.gov.in - Question and Answer Dataset
Economy · 1,013 rows
Higher Education in India - Question and Answer Dataset
Economy · 1,594 rows
Gender Policy of NABARD - Question and Answer Dataset
Economy · 14 rows
ICAR Annual Report 2025-26 - Question and Answer Dataset
Economy · 1,101 rows
First 10 of 112 rows
| question | answer | context | answer_start | question_type | knowledge_quality_score | source_quote | source_page | source_location | confidence | validation_status |
|---|---|---|---|---|---|---|---|---|---|---|
| What must SL or VOA do if there is a change in load instruction information? | any change in load instruction information, SL / VOA has to immediately inform the JSWMCTPL operations in writing | JSWMCTPL shall load the containers based on the information declared in the Export Advance List. If there is any change in load instruction information, SL / VOA has to immediately inform the JSWMCTPL operations in writing. The VOA is responsible for communicating the vessel loading instructions at prior arrival of the vessel. | 109 | definition | 1.000 | If there is any change in load instruction information, SL / VOA has to immediately inform the JSWMCTPL operations in writing. | 19 | page=19,ocr=1 | 0.850 | valid |
| What takes precedence in case of discrepancies? | any discrepancies the Standard Operating Procedures (SOPs) takes precedence | Everything in this document is correct as at the time of publication. If there are any discrepancies the Standard Operating Procedures (SOPs) takes precedence. However, data contained in this manual may change from time to time as per dynamic Operational & Maintenance requirements and also subject to prevailing weather conditions. | 83 | definition | 0.980 | If there are any discrepancies the Standard Operating Procedures (SOPs) takes precedence. | 4 | page=4,ocr=1 | 0.850 | valid |
| Who is responsible for providing instructions for containers to enter or exit the terminal? | the Shipping Line and CHA | Infrastructure TERMINAL OPERATION AND JSWMCTPL/O&M/01 JSW Mangalore Container MAINTENANCE MANUAL Date: 2. IMPORT CYCLE 2. Gate Operations: Terminal Access Control JSWMCTPL controls access of transporting companies to the terminal. Trucks having Insurance and PUC certificate with driver possessing valid driving license shall only be permitted entry inside JSWMCTPL. Container Exit and Access validation JSWMCTPL performs a Container Exit and Access validation. Containers are only allowed to leave or enter the terminal upon instructions received from the Shipping Line and CHA. Export Containers(s) Shipping Line / CHA / Transporter need to be applied for gate pass through NMPT RFID PIS (pass issuance system) before approach the terminal through Gate pass/RFID registration process. JSWMCTPL shall provide User ID and Password for accessing the TOS and / or Portal Application. | 553 | relationship | 0.970 | Containers are only allowed to leave or enter the terminal upon instructions received from the Shipping Line and CHA. | 13 | page=13,ocr=1 | 0.700 | valid |
| What could happen if the VOA does not provide the necessary details before a vessel's arrival? | the berthing program of the vessel may be changed, depending upon other vessels schedule | Vessel Operations Vessel Call information Vessel call information needs to be given by VOA on daily basis to JSWMCTPL planning department by mail. The VOA shall give the exact ETA and the required information below in prior arrival at the Port, failing which the berthing program of the vessel may be changed, depending upon other vessels schedule. The required information consists of: * Vessel name, ETA and ETD * Expected number of moves per vessel call split in: * IMDG class containers * Live Refrigerated containers - discharge / load moves. * Any other special containers Upon receipt of the above information, JSWMCTPL will prepare the berth and equipment plan and shall advise the VOA of the vessel ETA / ETD. | 259 | relationship | 0.970 | The VOA shall give the exact ETA and the required information below in prior arrival at the Port, failing which the berthing program of the vessel may be changed, depending upon other vessels schedule. | 16 | page=16,ocr=1 | 0.700 | valid |
| Why are procedures and checklists designed to be clear and concise for maintenance activities? | to ensure that all the works carried out by the technical staff are consistent and of high quality | In order to ensure that all the works carried out by the technical staff are consistent and of high quality, clear and concise procedures and checklists are formulated for various maintenance activities, especially those that involve expensive components and close co-ordination among different parties. Maintenance checklists and procedures are crafted based on recommendations from the equipment suppliers. Critical information relating to the measurements to be taken and “discard” criteria are included in these checklists to enable the staff to make decisions on appropriate course of action. | 9 | relationship | 0.970 | In order to ensure that all the works carried out by the technical staff are consistent and of high quality, clear and concise procedures and checklists are formulated for various maintenance activities, especially those that involve expensive components and close co-ordination among different parties. | 24 | page=24,ocr=1 | 0.700 | valid |
| What is the purpose of standard operating procedures for accident repairs? | so that equipment involved in an accident can be attended to immediately so as to avoid disruption to operations | Unscheduled repairs — includes breakdown repairs and accident repairs. Breakdown Repairs Immediate attention is required on equipment that has broken down and ad-hoc repairs are required to restore the equipment back to operational state in the shortest possible time. Technical staff, trained in diagnosing equipment faults and quick restoration, will be rostered to be throughout operational hours. Accident Repairs Standard operating procedures will be set up so that equipment involved in an accident can be attended to immediately so as to avoid disruption to operations. Repair of the equipment can be done immediately or at a later date depending on the extent of damage and disruption to operations. Escalation matrix during breakdown. Whenever there is fault in the crane the operator will inform the Engineering shift in-charge/Engineering technician over VHF. | 463 | relationship | 0.970 | Accident Repairs Standard operating procedures will be set up so that equipment involved in an accident can be attended to immediately so as to avoid disruption to operations. | 25 | |||
| What is the main objective of the project planned at New Mangalore Port? | Mechanization of Berth No. 14 for handling Containers and other Cargo | The port is located at 170 nautical miles south of Mormugao Port and 191 nautical miles north of Cochin Port. The proposed project is about Mechanization of Berth No. 14 for handling Containers and other Cargo and operation/ maintenance thereof (the “Project”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) Model basis at the NMPT. It is proposed that Container and Other Cargo to be handled at the Terminal. container will be one of the major drivers of traffic. Through a bidding process, a consortium of JSW Group Companies has been selected as the Concessionaire for the project. An SPV in the name of M/s. JSW Mangalore Container Terminal Private Limited (JSWMCTPL) is incorporated for the development and operations of the project. The project site is located inside the New Mangalore Port. | 140 | summary | 0.970 | The proposed project is about Mechanization of Berth No. 14 for handling Containers and other Cargo and operation/ maintenance thereof (the “Project”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) Model basis at the NMPT. | 8 | page=8,ocr=1 | ||
| What is the protocol if a truck arrives with significant container damages? | The truck shall not be allowed to enter JSWMCTPL with the container(s) | JSWMCTPL shall perform the following checks: * Container damages * Seal Integrity Check * IMO Labelling (Hazardous Containers) In case of: * Heavy container damages * Non-compliance Seal Integrity * Without IMO labels The truck shall not be allowed to enter JSWMCTPL with the container(s) and will be requested to either return back to the truck parking area for further investigation and / or follow-up. In case of a non-essential IMO labelling, the driver will be requested to the removal of labelling before being accepted to enter the terminal and deliver the container(s). Equipment Interchange Report (EIR) Export Containers: After physical check of the container, Personnel at the Gate counter(s) shall cross check the Haulier request form with the TOS and Gate clerk shall generate the EIR with yard location(s) in where the truck will have to report for offloading the container(s). | 218 | summary | 0.970 | JSWMCTPL shall perform the following checks: * Container damages * Seal Integrity Check * IMO Labelling (Hazardous Containers) In case of: * Heavy container damages * Non-compliance Seal Integrity * Without IMO labels The truck shall not be allowed to enter JSWMCTPL with the container(s) and will be requested to either return back to the truck parking area for further investigation and / or follow-up. | ||||
| What actions should be taken if abnormalities are found on CHEs? | brought to the notice of Shift In Charge immediately and the equipment shall be handed over to Engg. Dept for maintenance | Infrastructure TERMINAL OPERATION AND JSWMCTPL/O&M/01 ¢ Monitor by road trailer movement and maintain truck turn time as per terminal standards e Any abnormalities observed on CHEs shall be brought to the notice of Shift In Charge immediately and the equipment shall be handed over to Engg. Dept for maintenance. e The CHEs shall be given for Planned Maintenance / Diesel Filling on the basis of “Equipment Deployment Schedule” without affecting the operations any tower stacking is formed during the course of operation the same shall be brought down by the CHE operator in consultation with Shift In Charge and to inform planning for the updating in system e Extra care to be taken while planning Hazardous containers in CY. ¢ Incase of more than 1 Hazardous container, they must be stacked separately in Hazardous Yard duly following Segregation pattern. | 190 | summary | 0.970 | Infrastructure TERMINAL OPERATION AND JSWMCTPL/O&M/01 ¢ Monitor by road trailer movement and maintain truck turn time as per terminal standards e Any abnormalities observed on CHEs shall be brought to the notice of Shift In Charge immediately and the equipment shall be handed over to Engg. Dept for maintenance. | ||||
| What steps should be taken if tower stacking occurs during operations? | the same shall be brought down by the CHE operator in consultation with Shift In Charge and to inform planning for the updating in system | Infrastructure TERMINAL OPERATION AND JSWMCTPL/O&M/01 ¢ Monitor by road trailer movement and maintain truck turn time as per terminal standards e Any abnormalities observed on CHEs shall be brought to the notice of Shift In Charge immediately and the equipment shall be handed over to Engg. Dept for maintenance. e The CHEs shall be given for Planned Maintenance / Diesel Filling on the basis of “Equipment Deployment Schedule” without affecting the operations any tower stacking is formed during the course of operation the same shall be brought down by the CHE operator in consultation with Shift In Charge and to inform planning for the updating in system e Extra care to be taken while planning Hazardous containers in CY. ¢ Incase of more than 1 Hazardous container, they must be stacked separately in Hazardous Yard duly following Segregation pattern. | 521 | summary | 0.970 | e The CHEs shall be given for Planned Maintenance / Diesel Filling on the basis of “Equipment Deployment Schedule” without affecting the operations any tower stacking is formed during the course of operation the same shall be brought down by the CHE operator in consultation with Shift In Charge and to inform planning for the updating in system e Extra care to be taken while planning Hazardous containers in CY. |
Read straight from the file — download or use the API URL for the full dataset.
| page=25,ocr=1 |
| 0.700 |
| valid |
| 0.700 |
| valid |
| 14 |
| page=14,ocr=1 |
| 0.700 |
| valid |
| 16 |
| page=16,ocr=1 |
| 0.700 |
| valid |
| 16 |
| page=16,ocr=1 |
| 0.700 |
| valid |