113 extractive question-and-answer pairs built from 4. Noise Monitoring and Prevention, published by newmangaloreport.gov.in. Every answer is a verbatim span of text the source prints, and each row carries the passage it sits in, its offset in that passage, the source quote, the page and the location in the document, so any row can be checked against the original. 60 of the 113 pairs (53.1%) are explanatory questions and 53 restate a figure. 100.00% of rows pass the corpus quality gate.
Use the API URL with your free DD token in notebooks, scripts, and pipelines.
https://www.desidata.in/api/datasets/noise-monitoring-and-prevention-question-and-answer-dataset/downloadDataset downloads are free. For Python or API downloads, sign in once and create a free DD token; set it as DD_TOKEN or save it in your notebook's secrets. Requests are linked to your account so your download history and counts stay accurate.
# One-time install: pip install desidata
# Set DD_TOKEN in your environment first (create a free token in Profile & settings).
import desidata
df = desidata.load("noise-monitoring-and-prevention-question-and-answer-dataset")
df.head()Sign in with Google to download.
Usable for analysis, but expect some cleaning before you rely on it.
New Mangalore Port Authority Environment Test Reports (March 2025) - Question and Answer Dataset
Economy · 25 rows
Stevedoring and Shore Handling Policy - Question and Answer Dataset
Economy · 285 rows
Half Yearly EC Compliance Report - Question and Answer Dataset
Economy · 32 rows
New Mangalore Port Authority Environment Test Reports (October 2025) - Question and Answer Dataset
Economy · 89 rows
Annual Report 2015-16 by agriwelfare.gov.in - Question and Answer Dataset
Economy · 1,013 rows
Higher Education in India - Question and Answer Dataset
Economy · 1,594 rows
Gender Policy of NABARD - Question and Answer Dataset
Economy · 14 rows
ICAR Annual Report 2025-26 - Question and Answer Dataset
Economy · 1,101 rows
First 10 of 113 rows
| question | answer | context | answer_start | question_type | knowledge_quality_score | source_quote | source_page | source_location | confidence | validation_status |
|---|---|---|---|---|---|---|---|---|---|---|
| What is the treated water from the 8KLD STP used for? | used for gardening purpose 3 | The terminal has installed 8KLD STP. The treated water is used for gardening purpose 3.10 No diversion of the natural course of the river shall be made without prior permission from the Ministry of water resources. | 58 | definition | 1.000 | The treated water is used for gardening purpose 3. | 6 | page=6,block=0 | 0.850 | valid |
| What is the purpose of shrouding at the work site? | This will act as dust curtain as well achieving zero dust discharge from the site | Appropriate Air Pollution Control (APC) system shall be provided for all dust generating points including fugitive dust from all vulnerable sources, so as to comply prescribed emission standards. The dust generating sources have been identified and appropriate mitigative measures are taken to avoid fugitive emissions. 2. Shrouding shall be carried out in the work site enclosing the dock/proposed facility area. This will act as dust curtain as well achieving zero dust discharge from the site. | 414 | definition | 1.000 | Shrouding shall be carried out in the work site enclosing the dock/proposed facility area. This will act as dust curtain as well achieving zero dust discharge from the site. | 4 | page=4,block=0 | 0.700 | valid |
| What is the purpose of the sewage treatment plant mentioned? | to treat the waste water generated from the project | The project proponents will draw up and implement a plan for the management of temperature differences between intake waters and discharge waters. Noted 3. Spillage of fuel/engine oil and lubricants from the construction site are a source of organic pollution which impacts marine life. This shall be prevented by suitable precautions and also by providing necessary mechanisms to trap the spillage. Noted 3. Total fresh water use shall not exceed the proposed requirement as provided in the project details. Prior permission from Competent Authority shall be obtained for use of fresh water. Noted 3. Sewage treatment Plant shall be provided to treat the waste water generated from the project. Treated water shall be reused for horticulture, flushing, backwash, HVAC purposes and dust suppression. Noted | 643 | definition | 1.000 | Sewage treatment Plant shall be provided to treat the waste water generated from the project. | 5 | page=5,block=0 | 0.700 | valid |
| What are the consequences of concealing factual data or submitting false information? | revocation of this environmental clearance and attract action under the provisions of Environment (protection) Act, 1986 | Noted 11.9 No further expansion or modification in the project shall be carried out without prior approval of the Ministry of Environment, Forest and climate change (MoEF & CC) Noted 11.10 Concealing factual data or submission of false/fabricated dada may result in revocation of this environmental clearance and attract action under the provisions of Environment (protection) Act, 1986. Noted 11.11 The Ministry may revoke or suspend the clearance, if implementation of any of the above conditions is not satisfactory under the provisions of the Environmental (protection) Act 1986, to ensure effective implementation of the suggested safeguard measures in a time bound and satisfactory manner. | 266 | relationship | 0.970 | Concealing factual data or submission of false/fabricated dada may result in revocation of this environmental clearance and attract action under the provisions of Environment (protection) Act, 1986. | 11 | page=11,block=8 | 0.800 | valid |
| What actions are taken to ensure air quality meets the required standards? | regular water sprinkling shall be carried out in critical areas prone to air pollution | Coal yard is having concrete garland drains for collecting the overflow water coming out of yards and drains are connected with concrete settling pond with filtration system. Apart from this, Fire hydrants are provided around the coal yard. Roads are concretized with sprinkler system to mitigate fugitive emission. 1. Effective safeguard measures, such as regular water sprinkling shall be carried out in critical areas prone to air pollution and having high level of particulate matter such as around loading and unloading points and all transfer points. Extensive water sprinkling shall be carried out on haul roads. It should be ensured that the Ambient Air Quality parameters conform to the norms prescribed by the Central Pollution Control Board in this regard. | 357 | relationship | 0.970 | Effective safeguard measures, such as regular water sprinkling shall be carried out in critical areas prone to air pollution and having high level of particulate matter such as around loading and unloading points and all transfer points. | 1 | page=1,block=0 | 0.700 | |
| What actions may result from concealing factual data or submitting false data? | revocation of this environmental clearance and attract action under the provisions of Environment (protection) Act, 1986 | Noted 11. The project authorities must strictly adhere to the stipulations made by the State Pollution Control Board and the State Government. Noted 11. The project proponent shall abide by all the commitments and recommendations made in the EIA/EMP report, commitment made during Public hearing and also that during their presentation to the Expert Appraisal Committee. Noted 11. No further expansion or modification in the project shall be carried out without prior approval of the Ministry of Environment, Forest and climate change (MoEF & CC) Noted 11. Concealing factual data or submission of false/fabricated dada may result in revocation of this environmental clearance and attract action under the provisions of Environment (protection) Act, 1986. Noted 11. | 634 | relationship | 0.970 | Concealing factual data or submission of false/fabricated dada may result in revocation of this environmental clearance and attract action under the provisions of Environment (protection) Act, 1986. | 11 | page=11,block=8 | 0.700 | |
| What is the purpose of the high raised boundary wall, green belt, and wind shield around the stack yard? | to avoid air borne emissions | Ship Unloaders, SCR, Transfer points of Conveyors & Wagon Loading system.(JSW) Mechanized Cargo handling conveyor system having in built dry fog dust suppression and all the transfer towers/elevated gallery are fully covered with Galvalume sheets to avoid air borne emissions, in addition to DFDSS. 1. High raised boundary wall. 2. Green belt around the stack yard 3. Wind shield at the predominant wind direction. 4. Garland drains & Settling Pond with filtration system 5. Vehicle Wheel wash system. 1. Storage of the cargo shall be accommodated with a Stacker reclaimed inside provided with DFS (Atomized Automatic Sprinkling System) including peripheral drainage system, internal roads, firefighting system etc The stack yard is covered with High efficient Automatic water sprinkling system to mitigate the air pollution, which sprinkle water on the coal heaps in regular intervals. | 247 | relationship | 0.970 | Ship Unloaders, SCR, Transfer points of Conveyors & Wagon Loading system.(JSW) Mechanized Cargo handling conveyor system having in built dry fog dust suppression and all the transfer towers/elevated gallery are fully covered with Galvalume sheets to avoid air borne emissions, in addition to DFDSS. | ||||
| What may happen if a project proponent conceals factual data or submits false information? | revocation of this environmental clearance and attract action under the provisions of Environment (protection) Act, 1986 | Noted 11. The project authorities must strictly adhere to the stipulations made by the State Pollution Control Board and the State Government. Noted 11. The project proponent shall abide by all the commitments and recommendations made in the EIA/EMP report, commitment made during Public hearing and also that during their presentation to the Expert Appraisal Committee. Noted 11. No further expansion or modification in the project shall be carried out without prior approval of the Ministry of Environment, Forest and climate change (MoEF & CC) Noted 11. Concealing factual data or submission of false/fabricated dada may result in revocation of this environmental clearance and attract action under the provisions of Environment (protection) Act, 1986. Noted 11. | 634 | relationship | 0.970 | Concealing factual data or submission of false/fabricated dada may result in revocation of this environmental clearance and attract action under the provisions of Environment (protection) Act, 1986. | 11 | page=11,block=8 | 0.700 | |
| What is the responsibility of the project authorities towards the Regional Office officers? | extend full cooperation to the officer (s) of the Regional Office by furnishing the requisite dada/ information/ monitoring reports | The Ministry may revoke or suspend the clearance, if implementation of any of the above conditions is not satisfactory under the provisions of the Environmental (protection) Act 1986, to ensure effective implementation of the suggested safeguard measures in a time bound and satisfactory manner. Noted 11. The Ministry reserves the right to stipulate additional conditions if found necessary. The Company in a time bound manner shall implement these conditions. Noted 11. The Regional Office of this Ministry shall monitor compliance of the stipulated conditions. The project authorities should extend full cooperation to the officer (s) of the Regional Office by furnishing the requisite dada/ information/ monitoring reports. Noted 11. | 595 | relationship | 0.970 | The project authorities should extend full cooperation to the officer (s) of the Regional Office by furnishing the requisite dada/ information/ monitoring reports. | 11 | page=11,block=8 | 0.700 | valid |
| What is the function of the high-efficiency dust extraction system in the cargo handling area? | to mitigate the air pollution | HALF YEARLY COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE FOR ENHANCEMENT OF CARGO HANDLING CAPACITY FROM 6. MTPA TO 8. MTPA OF EXCISTING OPERATIONAL BERTH NO 16 EC NO: 24A3501KA5159064N Dated 15.11. Specific EC Conditions for (Ports, Harbors, Breakwaters, Dredging) 1. Specific Conditions Sl.No. EC Conditions Status of Compliance 1. Cargo, handling area shall be provided with the adequate number of high efficiency dust extraction system. Loading and unloading areas including all the transfer points should also have efficient dust control arrangements. These should be properly maintained and operated. The stack yard is having High efficiency water sprinkling system to mitigate the air pollution, which sprinkle water on the coal heaps in regular intervals. Having/implemented Dry Fog Dust Suppression System in all the equipment of Mechanized Material Handling system viz. | 673 | summary | 0.970 | The stack yard is having High efficiency water sprinkling system to mitigate the air pollution, which sprinkle water on the coal heaps in regular intervals. | 1 | page=1,block=0 | 0.700 |
Read straight from the file — download or use the API URL for the full dataset.
| valid |
| valid |
| 1 |
| page=1,block=0 |
| 0.700 |
| valid |
| valid |
| valid |