125 extractive question-and-answer pairs built from Half yearly report Berth No.1 7 Apr2026, published by newmangaloreport.gov.in. Every answer is a verbatim span of text the source prints, and each row carries the passage it sits in, its offset in that passage, the source quote, the page and the location in the document, so any row can be checked against the original. 62 of the 125 pairs (49.6%) are explanatory questions and 63 restate a figure. 100.00% of rows pass the corpus quality gate.
Use the API URL with your free DD token in notebooks, scripts, and pipelines.
https://www.desidata.in/api/datasets/half-yearly-report-on-berth-no-1-7-april-2026-question-and-answer-dataset/downloadDataset downloads are free. For Python or API downloads, sign in once and create a free DD token; set it as DD_TOKEN or save it in your notebook's secrets. Requests are linked to your account so your download history and counts stay accurate.
# One-time install: pip install desidata
# Set DD_TOKEN in your environment first (create a free token in Profile & settings).
import desidata
df = desidata.load("half-yearly-report-on-berth-no-1-7-april-2026-question-and-answer-dataset")
df.head()Sign in with Google to download.
Usable for analysis, but expect some cleaning before you rely on it.
New Mangalore Port Authority Environment Test Reports (March 2025) - Question and Answer Dataset
Economy · 25 rows
Stevedoring and Shore Handling Policy - Question and Answer Dataset
Economy · 285 rows
Half Yearly EC Compliance Report - Question and Answer Dataset
Economy · 32 rows
New Mangalore Port Authority Environment Test Reports (October 2025) - Question and Answer Dataset
Economy · 89 rows
Annual Report 2015-16 by agriwelfare.gov.in - Question and Answer Dataset
Economy · 1,013 rows
Higher Education in India - Question and Answer Dataset
Economy · 1,594 rows
Gender Policy of NABARD - Question and Answer Dataset
Economy · 14 rows
ICAR Annual Report 2025-26 - Question and Answer Dataset
Economy · 1,101 rows
First 10 of 125 rows
| question | answer | context | answer_start | question_type | knowledge_quality_score | source_quote | source_page | source_location | confidence | validation_status |
|---|---|---|---|---|---|---|---|---|---|---|
| Who will the Senior Executive in charge of the Environmental Cell report to? | the head of the organization | shareholders/stakeholders. The copy of the board resolution in this regard shall be submitted to the MoEF&CC as a part of six- monthly report. A separate Environmental Cell both at the project and company head quarter level, with qualified personnel shall be set up under the control of Senior Executive, who will directly report to the head of the organization. Action plan for implementing EMP and environmental conditions along with responsibility matrix of the company shall be prepared and shall be duly approved by competent authority. The year wise funds earmarked for environmental protection measures shall be kept in separate account and not to be diverted for any other purpose. Year wise progress of implementation of action plan shall be reported to Ministry/Regional office along with the six monthly compliance report. Self environmental audit shall be conducted annually. | 333 | relationship | 0.970 | A separate Environmental Cell both at the project and company head quarter level, with qualified personnel shall be set up under the control of Senior Executive, who will directly report to the head of the organization. | 15 | page=15,ocr=1 | 0.700 | valid |
| What is the purpose of reorienting the backup storage area for Berth No. 17? | to ensure exclusion of vegetation tree growth area as far as possible | COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE FOR DEVELOPMENT OF MULTIPURPOSE CARGO BERTH (BERTH No 17) BY NMPA , PANAMBUR E C No: EC24A3501KA5561399N DATED 04/09/2024 ES DATED 04/09/2024 1. Specific Conditions Back up storage area for proposed berth no 17 shall be reoriented in order to ensure exclusion of vegetation tree growth area as far as possible. Accordingly revised backup area layout shall be submitted to the ministry with copy to the IRO for monitoring of the implementation. Balance area of the back up having prosopis trees shall be afforested with suitable native species. Special trees viz. prosopis trees are planted in June /July 2025. IRO-Bangalore, MoEF&CC monitored the port on 13.03.2024 and issued the Certified EC and CRZ compliance report vide letter no.EP/12.1/578/KAR 907 dated 08.04.2024 and noted some partial compliance and noncompliance. | 286 | summary | 0.970 | Specific Conditions Back up storage area for proposed berth no 17 shall be reoriented in order to ensure exclusion of vegetation tree growth area as far as possible. | 2 | page=2,ocr=1 | 0.700 | |
| What action should be taken if the Forest Department suggests specific mitigation measures during implementation? | the same shall be implemented | The conservation plan shall also include afforestation of unused backup area having specific growth and shall be implemented in consultation with the state forest department. during implementation period if any specific mitigation measure recommended by the Forest Department the same shall be implemented | 276 | summary | 0.970 | during implementation period if any specific mitigation measure recommended by the Forest Department the same shall be implemented | 2 | page=2,ocr=1 | 0.700 | valid |
| What is the purpose of the traffic management and decongestion plan? | to ensure that the current level of service of the roads within a O5kms radius of the project is maintained and improved upon | A detailed traffic management and traffic decongestion plan shall be drawn up to ensure that the current level of service of the roads within a O5kms radius of the project is maintained and improved upon after the implementation of the project. This plan should be based on cumulative impact of all development and increased habitation being carried out or proposed to be carried out by the project or other agencies in this 05 Kms radium of the site in different scenarios of space and time and the traffic management plan shall be duly validated and certified by the State Urban Development Department and the P.W.D/ competent authority for road augmentation and shall also have their consent to the implementation of components of the plan which involve the participation of these departments. | 78 | summary | 0.970 | A detailed traffic management and traffic decongestion plan shall be drawn up to ensure that the current level of service of the roads within a O5kms radius of the project is maintained and improved upon after the implementation of the project. | 9 | page=9,ocr=1 | ||
| What is the purpose of earth protection work? | avoid erosion of soil from the shoreline/boundary line from the land area into the marine water body | Earth protection work shall be carried out of avoid erosion of soil from the shoreline/boundary line from the land area into the marine water body. 4. Noise Monitoring and Prevention Noise level survey shall be carried as per the prescribed guidelines and report in this regard s be submitted to Regional Officer of the Ministry part of six monthly compliance report. Noise from vehicles, power machinery and equipment on-site should not exceed the limit. Equipment should be regularly serviced. Attention should also be given to muffler maintenance and enclosure of noisy equipments Acoustic enclosures for DG sets, noise barriers f Noted ground-run bays, ear plugs for operating person shall be implemented as mitigation measures for noise impact due to ground sources. The ambient noise levels should conform to the standard prescribed under E(P)A Rules, 1986 | 46 | summary | 0.970 | Earth protection work shall be carried out of avoid erosion of soil from the shoreline/boundary line from the land area into the marine water body. | 10 | page=10,ocr=1 | 0.700 | |
| What actions should be taken if negative effects are detected during dredging? | necessary measures shall be taken on priority basis | Already developed green Dredging shall not be carried out during the breeding and spawning seasons fish | Noted Dredging etc shall be carried out in the confined manner to reduce the impacts on marine environment. The dredging schedule shall be so planned that | Noted the turbidity developed is dispersed soon enough to prevent any stress on the fish population While carrying out dredging, an independent monitoring shall be carried out through a Government Agency/Institute to assess the impact and necessary measures shall be taken on priority basis if any adverse impact is observed. | 502 | summary | 0.970 | The dredging schedule shall be so planned that | Noted the turbidity developed is dispersed soon enough to prevent any stress on the fish population While carrying out dredging, an independent monitoring shall be carried out through a Government Agency/Institute to assess the impact and necessary measures shall be taken on priority basis if any adverse impact is observed. | 12 | page=12,ocr=1 | 0.700 | valid |
| What did the IRO-Bangalore note in their compliance report on 08.04.2024? | some partial compliance and noncompliance. | COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE FOR DEVELOPMENT OF MULTIPURPOSE CARGO BERTH (BERTH No 17) BY NMPA , PANAMBUR E C No: EC24A3501KA5561399N DATED 04/09/2024 ES DATED 04/09/2024 1. Specific Conditions Back up storage area for proposed berth no 17 shall be reoriented in order to ensure exclusion of vegetation tree growth area as far as possible. Accordingly revised backup area layout shall be submitted to the ministry with copy to the IRO for monitoring of the implementation. Balance area of the back up having prosopis trees shall be afforested with suitable native species. Special trees viz. prosopis trees are planted in June /July 2025. IRO-Bangalore, MoEF&CC monitored the port on 13.03.2024 and issued the Certified EC and CRZ compliance report vide letter no.EP/12.1/578/KAR 907 dated 08.04.2024 and noted some partial compliance and noncompliance. | 828 | summary | 0.970 | IRO-Bangalore, MoEF&CC monitored the port on 13.03.2024 and issued the Certified EC and CRZ compliance report vide letter no.EP/12.1/578/KAR 907 dated 08.04.2024 and noted some partial compliance and noncompliance. | 2 | page=2,ocr=1 | ||
| What must the project proponent ensure regarding creeks or rivers at the project site? | no creeks or rivers are blocked due to any activities at the project site and free flow of water is maintained | No construction works other than those permitted in Coastal Regulation Zone Notification shall be carried out in Coastal Regulation Zone area. All the recommendations and conditions specified | Noted by the Karnataka State Coastal Zone Management Authority (KCZMA) vide letter No FEE313 CRZ 2023 dated 14.03. The approach road shall be constructed strictly Noted follow the Coastal Regulation Zone Notification shall be carried out in Coastal Regulation Zone area and road should be build on stilts. Necessary approvals be taken during Noted implementation and commissioning from statutory bodies concerned The project proponent shall ensure that no creeks or rivers are blocked due to any activities at the project site and free flow of water is maintained. The total storage area is 12 ha out of which 1.7ha_ | Noted falls under the CRZ II area. No storage area shall be allowed in the CRZ area. | 647 | summary | 0.970 | Necessary approvals be taken during Noted implementation and commissioning from statutory bodies concerned The project proponent shall ensure that no creeks or rivers are blocked due to any activities at the project site and free flow of water is maintained. | ||||
| What is the purpose of the 4-lane roads being developed under the Bharatmala Scheme? | to cater the traffic demand of Berth No.17 | and the status of the compliance shall be submitted to the Concern IRO, MoEFCC along with the EC Compliance report. For smooth movement of the traffic near vicinity of the port. Under Bharatmala Scheme NHAI is developing 4 lane roads in NH75 connecting Bangalore via Hassan, Shiraidi Ghat, Bantwal cross road at NH 73 and connect NH-66 in Mangalore. The proposed project will facilitate the increase in traffic movement to the Port and new Mangalore port is well connected with NH-66,75 and NH-169. These National Highway are sufficient to cater the traffic demand of Berth No.17. The NH 66 (4 lane road) is passing through the port area around 3KM. Construction activity shall be carried out strictly Noted according to the provisions of the CRZ Notification,2019. | 537 | summary | 0.970 | These National Highway are sufficient to cater the traffic demand of Berth No.17. | 3 | page=3,ocr=1 | 0.700 | valid |
| What is the purpose of the company's environmental policy? | to have proper checks and balances and to bring into focus any infringements/deviation/violation of the environmental/forest/wildlife norms/ conditions | Provision shall be made for the housing of construction labour within the site will all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP safe drinking water, medical health Care, créche etc. The housing may be in the form of temporary Structures to be removed after the completion of the project. Occupational health surveillance of the workers shall be done on a regular basis. 10. Environment Responsibility The company shall have a well laid down environmental policy duly approved by the Board of Directors. The environmental policy should prescribe for standard operating procedures to have proper checks and balances and to bring into focus any infringements/deviation/violation of the environmental/forest/wildlife norms/ conditions. | 632 | summary | 0.970 | The environmental policy should prescribe for standard operating procedures to have proper checks and balances and to bring into focus any infringements/deviation/violation of the environmental/forest/wildlife norms/ conditions. | 14 | page=14,ocr=1 |
Read straight from the file — download or use the API URL for the full dataset.
| valid |
| 0.700 |
| valid |
| valid |
| 0.700 |
| valid |
| 3 |
| page=3,ocr=1 |
| 0.700 |
| valid |
| 0.700 |
| valid |