32 extractive question-and-answer pairs built from Half Yearly EC Compliance report april 26, published by newmangaloreport.gov.in. Every answer is a verbatim span of text the source prints, and each row carries the passage it sits in, its offset in that passage, the source quote, the page and the location in the document, so any row can be checked against the original. 22 of the 32 pairs (68.8%) are explanatory questions and 10 restate a figure. 100.00% of rows pass the corpus quality gate.
Use the API URL with your free DD token in notebooks, scripts, and pipelines.
https://www.desidata.in/api/datasets/half-yearly-ec-compliance-report-question-and-answer-dataset/downloadDataset downloads are free. For Python or API downloads, sign in once and create a free DD token; set it as DD_TOKEN or save it in your notebook's secrets. Requests are linked to your account so your download history and counts stay accurate.
# One-time install: pip install desidata
# Set DD_TOKEN in your environment first (create a free token in Profile & settings).
import desidata
df = desidata.load("half-yearly-ec-compliance-report-question-and-answer-dataset")
df.head()Sign in with Google to download.
Usable for analysis, but expect some cleaning before you rely on it.
New Mangalore Port Authority Environment Test Reports (March 2025) - Question and Answer Dataset
Economy · 25 rows
New Mangalore Port Authority Environment Test Reports (October 2025) - Question and Answer Dataset
Economy · 89 rows
Stevedoring and Shore Handling Policy - Question and Answer Dataset
Economy · 285 rows
Compliance Report for Environmental Clearance for Development - Question and Answer Dataset
Economy · 149 rows
Annual Report 2015-16 by agriwelfare.gov.in - Question and Answer Dataset
Economy · 1,013 rows
Higher Education in India - Question and Answer Dataset
Economy · 1,594 rows
Gender Policy of NABARD - Question and Answer Dataset
Economy · 14 rows
ICAR Annual Report 2025-26 - Question and Answer Dataset
Economy · 1,101 rows
First 10 of 32 rows
| question | answer | context | answer_start | question_type | knowledge_quality_score | source_quote | source_page | source_location | confidence | validation_status |
|---|---|---|---|---|---|---|---|---|---|---|
| What kind of monitoring system is required for air and water pollution? | Automatic / online monitoring system (24 x 7) monitoring devices | Flow meters are installed in the sewage treatment plant. Automatic / online monitoring system (24 x 7) monitoring devices for air pollution as well as water pollution in respect of flow measurement and relevant pollutants in the treatment system shall be installed. The data should be made available to the respective SPCB and in the Company’s website. All the recommendations mentioned in the rapid risk assessment report, disaster management plan and safety guidelines shall be implemented. Implemented All other conditions will remain unchanged. | 57 | definition | 1.000 | Flow meters are installed in the sewage treatment plant. Automatic / online monitoring system (24 x 7) monitoring devices for air pollution as well as water pollution in respect of flow measurement and relevant pollutants in the treatment system shall be installed. | 5 | page=5,ocr=1 | 0.700 | valid |
| Why must adequate infrastructural facilities be provided for labourers during construction? | in order to avoid damage to the environment. | Environmental Clearances Compliance Report 1. EC No: PD/26017/11//98-PDZ(CRZ) issued on 13-05-1999 and 2. EC No. PD/26018/12//98-PDZ(CRZ) issued on 19-05-1999 EC Conditions Status of Compliance All construction design/drawings relating to construction activities must have the approval of the concerned State Govt. Departments/Agencies. Ground water should not be tapped for construction activities. Adequate provision for all infrastructural facilities such as water supply, fuel, sanitation etc. must be extended for labourers during the construction period in order to avoid damage to the environment. | 560 | relationship | 0.970 | must be extended for labourers during the construction period in order to avoid damage to the environment. | 2 | page=2,ocr=1 | 0.700 | valid |
| What should be considered when designing disposal sites for excavated material? | the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. | Statutory approvals were obtained at the of construction and work is completed During the project work provision for all infra structural facilities like water supply, Sanitation etc., was provided for labourers Dredging operations, if any, should be undertaken in consultation with either the Central Water and Power Research Station, Pune or the National Institute of Oceanography, Goa to ensure that dredging operations do not cause adverse impact on water quality and marine productivity in the vicinity. Dredging operation as far as possible should be kept to the minimum for avoiding any adverse impact on marine life. Disposal sites for excavated material should be so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. | 690 | relationship | 0.970 | Disposal sites for excavated material should be so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. | 2 | page=2,ocr=1 | 0.700 | |
| What should be ensured during dredging operations to avoid adverse impacts on water quality and marine productivity? | consultation with either the Central Water and Power Research Station, Pune or the National Institute of Oceanography, Goa | Statutory approvals were obtained at the of construction and work is completed During the project work provision for all infra structural facilities like water supply, Sanitation etc., was provided for labourers Dredging operations, if any, should be undertaken in consultation with either the Central Water and Power Research Station, Pune or the National Institute of Oceanography, Goa to ensure that dredging operations do not cause adverse impact on water quality and marine productivity in the vicinity. Dredging operation as far as possible should be kept to the minimum for avoiding any adverse impact on marine life. Disposal sites for excavated material should be so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. | 265 | relationship | 0.970 | Statutory approvals were obtained at the of construction and work is completed During the project work provision for all infra structural facilities like water supply, Sanitation etc., was provided for labourers Dredging operations, if any, should be undertaken in consultation with either the Central Water and Power Research Station, Pune or the National Institute of Oceanography, Goa to ensure that dredging operations do not cause adverse impact on water quality and marine productivity in the vicinity. | ||||
| Why should dredging operations be kept to a minimum? | for avoiding any adverse impact on marine life | Statutory approvals were obtained at the of construction and work is completed During the project work provision for all infra structural facilities like water supply, Sanitation etc., was provided for labourers Dredging operations, if any, should be undertaken in consultation with either the Central Water and Power Research Station, Pune or the National Institute of Oceanography, Goa to ensure that dredging operations do not cause adverse impact on water quality and marine productivity in the vicinity. Dredging operation as far as possible should be kept to the minimum for avoiding any adverse impact on marine life. Disposal sites for excavated material should be so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. | 577 | relationship | 0.970 | Dredging operation as far as possible should be kept to the minimum for avoiding any adverse impact on marine life. | 2 | page=2,ocr=1 | 0.700 | valid |
| What is the purpose of minimizing dredging operations? | avoiding any adverse impact on marine life | Statutory approvals were obtained at the of construction and work is completed During the project work provision for all infra structural facilities like water supply, Sanitation etc., was provided for labourers Dredging operations, if any, should be undertaken in consultation with either the Central Water and Power Research Station, Pune or the National Institute of Oceanography, Goa to ensure that dredging operations do not cause adverse impact on water quality and marine productivity in the vicinity. Dredging operation as far as possible should be kept to the minimum for avoiding any adverse impact on marine life. Disposal sites for excavated material should be so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. | 581 | summary | 0.970 | Dredging operation as far as possible should be kept to the minimum for avoiding any adverse impact on marine life. | 2 | page=2,ocr=1 | 0.700 | valid |
| How should the design of disposal sites for excavated material account for land use changes? | so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage | Statutory approvals were obtained at the of construction and work is completed During the project work provision for all infra structural facilities like water supply, Sanitation etc., was provided for labourers Dredging operations, if any, should be undertaken in consultation with either the Central Water and Power Research Station, Pune or the National Institute of Oceanography, Goa to ensure that dredging operations do not cause adverse impact on water quality and marine productivity in the vicinity. Dredging operation as far as possible should be kept to the minimum for avoiding any adverse impact on marine life. Disposal sites for excavated material should be so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. | 673 | summary | 0.970 | Disposal sites for excavated material should be so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. | 2 | page=2,ocr=1 | ||
| What is the purpose of standby DG sets in the project? | to ensure uninterrupted power supply to the pump house and the fire fighting system | Necessary leakage detection devices with early warning system must be provided at strategic locations. DG sets with Acoustic enclosers were used for the project work to supply power Standby DG sets must be provided to ensure uninterrupted power supply to the pump house and the fire fighting system. Third party inspection should be ensured during construction and operation phases with adequate insurance cover. The project authorities should confirm on regular intervals of six months to the Ministry about the implementation of the suggested safeguard measures and the data/report should be opened for inspection by the Team which would be constituted by the Ministry, if found necessary. KSPCB and Director, MOEF&CC, Bangalore inspected the Port and verified the compliance reports maintained by the Ports. | 215 | summary | 0.970 | DG sets with Acoustic enclosers were used for the project work to supply power Standby DG sets must be provided to ensure uninterrupted power supply to the pump house and the fire fighting system. | 4 | page=4,ocr=1 | 0.700 | |
| What is the purpose of regular air and water quality sample testing? | Air pollution control measures to be provided are water sprinklers; closed conveyor, bag filter and mechanized cargo handling | Revised Stipulated Environmental Clearances Report as per the Letter No December 201 6 Specific Conditions: Status of Compliance | 1 Construction activity shall be carried out strictly according to the provisions of CRZ Notification, Complied. 2011. No construction work other than those permitted in Coastal Regulation Zone Notification shall be carried out in Coastal Regulation Zone area. All the recommendations and conditions specified by Karnataka Coastal Zone Management Complied. Authority (KCZMA) vide letter no. FEE 580 CRZ 2015 dated 07.01.2016 shall be complied with. As proposed, a fully mechanized coal unloading Complied. system shall be provided for Berth 13. Air pollution control measures to be provided are water sprinklers; closed conveyor, bag filter and mechanized cargo handling. Regular Air & Water quality sample testing are carried out. | 676 | summary | 0.970 | system shall be provided for Berth 13. Air pollution control measures to be provided are water sprinklers; closed conveyor, bag filter and mechanized cargo handling. | 5 | page=5,ocr=1 | ||
| What should be considered when designing disposal sites for excavated material? | that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage | Statutory approvals were obtained at the of construction and work is completed During the project work provision for all infra structural facilities like water supply, Sanitation etc., was provided for labourers Dredging operations, if any, should be undertaken in consultation with either the Central Water and Power Research Station, Pune or the National Institute of Oceanography, Goa to ensure that dredging operations do not cause adverse impact on water quality and marine productivity in the vicinity. Dredging operation as far as possible should be kept to the minimum for avoiding any adverse impact on marine life. Disposal sites for excavated material should be so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. | 685 | summary | 0.970 | Disposal sites for excavated material should be so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. | 2 | page=2,ocr=1 | 0.700 |
Read straight from the file — download or use the API URL for the full dataset.
| valid |
| 2 |
| page=2,ocr=1 |
| 0.700 |
| valid |
| 0.700 |
| valid |
| valid |
| 0.700 |
| valid |
| valid |