54 extractive question-and-answer pairs built from Half yearly compliance report other ECS (pdf) 0, published by newmangaloreport.gov.in. Every answer is a verbatim span of text the source prints, and each row carries the passage it sits in, its offset in that passage, the source quote, the page and the location in the document, so any row can be checked against the original. 37 of the 54 pairs (68.5%) are explanatory questions and 17 restate a figure. 98.15% of rows pass the corpus quality gate.
Use the API URL with your free DD token in notebooks, scripts, and pipelines.
https://www.desidata.in/api/datasets/half-yearly-compliance-report-on-environmental-safeguards-at-new-mangalore-port/downloadDataset downloads are free. For Python or API downloads, sign in once and create a free DD token; set it as DD_TOKEN or save it in your notebook's secrets. Requests are linked to your account so your download history and counts stay accurate.
# One-time install: pip install desidata
# Set DD_TOKEN in your environment first (create a free token in Profile & settings).
import desidata
df = desidata.load("half-yearly-compliance-report-on-environmental-safeguards-at-new-mangalore-port")
df.head()Sign in with Google to download.
Usable for analysis, but expect some cleaning before you rely on it.
New Mangalore Port Authority Environment Test Reports (March 2025) - Question and Answer Dataset
Economy · 25 rows
Stevedoring and Shore Handling Policy - Question and Answer Dataset
Economy · 285 rows
Half Yearly EC Compliance Report - Question and Answer Dataset
Economy · 32 rows
New Mangalore Port Authority Environment Test Reports (October 2025) - Question and Answer Dataset
Economy · 89 rows
Annual Report 2015-16 by agriwelfare.gov.in - Question and Answer Dataset
Economy · 1,013 rows
Higher Education in India - Question and Answer Dataset
Economy · 1,594 rows
Gender Policy of NABARD - Question and Answer Dataset
Economy · 14 rows
ICAR Annual Report 2025-26 - Question and Answer Dataset
Economy · 1,101 rows
First 10 of 54 rows
| question | answer | context | answer_start | question_type | knowledge_quality_score | source_quote | source_page | source_location | confidence | validation_status |
|---|---|---|---|---|---|---|---|---|---|---|
| What type of monitoring system is required for air and water pollution? | Automatic / online monitoring system (24 x 7) monitoring devices | Noted 4 Automatic / online monitoring system (24 x 7) monitoring devices for air pollution as well as water pollution in respect of flow measurement and relevant pollutants in the treatment system shall be installed. The data should be made available to the respective SPCB and in the Company’s website. Regular Air & Water quality sample testing are carried out till the Installation of Online monitoring system 24X7. Flow meters are installed in the sewage treatment plant. 5 All the recommendations mentioned in the rapid risk assessment report, disaster management plan and safety guidelines shall be implemented. Implemented 6 All other conditions will remain unchanged. Noted | 8 | definition | 1.000 | Noted 4 Automatic / online monitoring system (24 x 7) monitoring devices for air pollution as well as water pollution in respect of flow measurement and relevant pollutants in the treatment system shall be installed. | 4 | page=4,block=0 | 0.700 | valid |
| What type of monitoring system must be installed for air and water pollution? | Automatic / online monitoring system (24 x 7) monitoring devices | Noted 4 Automatic / online monitoring system (24 x 7) monitoring devices for air pollution as well as water pollution in respect of flow measurement and relevant pollutants in the treatment system shall be installed. The data should be made available to the respective SPCB and in the Company’s website. Regular Air & Water quality sample testing are carried out till the Installation of Online monitoring system 24X7. Flow meters are installed in the sewage treatment plant. 5 All the recommendations mentioned in the rapid risk assessment report, disaster management plan and safety guidelines shall be implemented. Implemented 6 All other conditions will remain unchanged. Noted | 8 | definition | 1.000 | Noted 4 Automatic / online monitoring system (24 x 7) monitoring devices for air pollution as well as water pollution in respect of flow measurement and relevant pollutants in the treatment system shall be installed. | 4 | page=4,block=0 | 0.700 | valid |
| What was the purpose of consulting the Central Water and Power Research Station or the National Institute of Oceanography for dredging operations? | to ensure that dredging operations do not cause adverse impact on water quality and marine productivity | During the project work provision for all infra structural facilities like water supply, Sanitation etc., was provided for labourers 3 Dredging operations, if any, should be undertaken in consultation with either the Central Water and Power Research Station, Pune or the National Institute of Oceanography, Goa to ensure that dredging operations do not cause adverse impact on water quality and marine productivity in the vicinity. Dredging operation as far as possible should be kept to the minimum for avoiding any adverse impact on marine life. | 311 | relationship | 0.970 | During the project work provision for all infra structural facilities like water supply, Sanitation etc., was provided for labourers 3 Dredging operations, if any, should be undertaken in consultation with either the Central Water and Power Research Station, Pune or the National Institute of Oceanography, Goa to ensure that dredging operations do not cause adverse impact on water quality and marine productivity in the vicinity. | 1 | page=1,block=1 | ||
| What measures were taken during capital dredging operations to safeguard marine life? | all necessary precautions were taken to avoid any adverse impact on marine life | Capital dredging operations conducted during the project work in consultation with CWPRS, Pune and all necessary precautions were taken to avoid any adverse impact on marine life 4 Disposal sites for excavated material should be so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. The excavated material of the project work was used for Reclamation of Tannirbhavi beach and didn’t interfere with natural damage 5 To meet any emergency situation, adequate foam containers should be kept ready with supporting fire fighting system and water pipeline. Fire fighting system & water pipeline was provided at construction area 6 The staff posted in sensitive areas should be trained in implementation of the Crisis Management Plan already drawn by the authorities. | 99 | summary | 0.970 | Capital dredging operations conducted during the project work in consultation with CWPRS, Pune and all necessary precautions were taken to avoid any adverse impact on marine life 4 Disposal sites for excavated material should be so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. | ||||
| What measures were implemented to protect the safety and health of dock workers during the project? | In-house Medical facility was provided and regularly Mock drills for different situations was provided | Mock drill(s) for this purpose should be conducted on a regular basis. Provisions of Dock Safety Act and the guidelines issued by the DG,FASLI/CLI, Bombay for the safety and health of the dock workers should be followed. During the project work safety and health of the dock workers was considered. In-house Medical facility was provided and regularly Mock drills for different situations was provided | 299 | summary | 0.970 | During the project work safety and health of the dock workers was considered. In-house Medical facility was provided and regularly Mock drills for different situations was provided | 1 | page=1,block=1 | 0.700 | valid |
| What should be done with the record and data collected by the Environmental Cell? | be submitted with proper analysis and corrective measures required, if any, for maintaining the levels within the prescribed limits | Environmental Monitoring was conducted regularly through Third party and the reports were submitted to KSPCB& MOEF&CC 11 An Environmental Cell should be immediately made operational with adequate laboratory facilities, equipments and a mobile van for collecting air samples. The record and the data should be submitted with proper analysis and corrective measures required, if any, for maintaining the levels within the prescribed limits to the Regional Office of the ministry of Environment & Forests at Bangalore, which shall be monitoring these conditions stipulated for according the Environment approval. The Environmental Cell should coordinate and monitor environmental mitigative measures executed in the New Mangalore Port area. | 306 | summary | 0.970 | The record and the data should be submitted with proper analysis and corrective measures required, if any, for maintaining the levels within the prescribed limits to the Regional Office of the ministry of Environment & Forests at Bangalore, which shall be monitoring these conditions stipulated for according the Environment approval. | ||||
| What precautionary measures were taken during capital dredging operations? | all necessary precautions were taken to avoid any adverse impact on marine life | Capital dredging operations conducted during the project work in consultation with CWPRS, Pune and all necessary precautions were taken to avoid any adverse impact on marine life 4 Disposal sites for excavated material should be so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. The excavated material of the project work was used for Reclamation of Tannirbhavi beach and didn’t interfere with natural damage 5 To meet any emergency situation, adequate foam containers should be kept ready with supporting fire fighting system and water pipeline. Fire fighting system & water pipeline was provided at construction area 6 The staff posted in sensitive areas should be trained in implementation of the Crisis Management Plan already drawn by the authorities. | 99 | summary | 0.970 | Capital dredging operations conducted during the project work in consultation with CWPRS, Pune and all necessary precautions were taken to avoid any adverse impact on marine life 4 Disposal sites for excavated material should be so designed that the revised land use after dumping and changes in the land use pattern do not interfere with the natural damage. | ||||
| What measures are recommended to prevent liquid waste discharge into the marine environment? | adequate system for collection, treatment and disposal of liquid wastes | 7 For development of green buffer including mangroves wherever feasible, the authorities should start growing large nursery of multipurpose species such as Eucalyptus, Casurina, Dalbergia, Termalia etc. The norm of about 2000-2500 trees per hectare maybe adopted for raising of green belt. The Port developed 649 acre land near kudupu and Bondel quarry area for plantation Port has developed its own Nursery and many species such as Dalbergia, Termalia etc were planted near beach side Port has developed 33% Green belt area 8 To prevent discharge of sewage and other liquid wastes including ballast into marine environment, adequate system for collection, treatment and disposal of liquid wastes must be provided to the satisfaction of Karnataka Pollution Control Board. Sewage Treatment Plant with 1. | 625 | summary | 0.970 | The Port developed 649 acre land near kudupu and Bondel quarry area for plantation Port has developed its own Nursery and many species such as Dalbergia, Termalia etc were planted near beach side Port has developed 33% Green belt area 8 To prevent discharge of sewage and other liquid wastes including ballast into marine environment, adequate system for collection, treatment and disposal of liquid wastes must be provided to the satisfaction of Karnataka Pollution Control Board. | ||||
| What is the purpose of the Environmental Cell in the New Mangalore Port area? | coordinate and monitor environmental mitigative measures | Environmental Monitoring was conducted regularly through Third party and the reports were submitted to KSPCB& MOEF&CC 11 An Environmental Cell should be immediately made operational with adequate laboratory facilities, equipments and a mobile van for collecting air samples. The record and the data should be submitted with proper analysis and corrective measures required, if any, for maintaining the levels within the prescribed limits to the Regional Office of the ministry of Environment & Forests at Bangalore, which shall be monitoring these conditions stipulated for according the Environment approval. The Environmental Cell should coordinate and monitor environmental mitigative measures executed in the New Mangalore Port area. | 640 | summary | 0.970 | The Environmental Cell should coordinate and monitor environmental mitigative measures executed in the New Mangalore Port area. | 2 | page=2,block=0 | 0.700 | valid |
| What should project authorities confirm to the Ministry at regular intervals? | the implementation of the suggested safeguard measures | 12 Necessary leakage detection devices with early warning system must be provided at strategic locations. Noted 13 Standby DG sets must be provided to ensure uninterrupted power supply to the pump house and the fire fighting system. Accoustic DG sets were used for the project work to supply power 14 Third party inspection should be ensured during construction and operation phases with adequate insurance cover. The project authorities should confirm on regular intervals of six months to the Ministry about the implementation of the suggested safeguard measures and the data/report should be opened for inspection by the Team which would be constituted by the Ministry, if found necessary. | 510 | summary | 0.970 | The project authorities should confirm on regular intervals of six months to the Ministry about the implementation of the suggested safeguard measures and the data/report should be opened for inspection by the Team which would be constituted by the Ministry, if found necessary. | 3 | page=3,block=0 | 0.700 | valid |
Read straight from the file — download or use the API URL for the full dataset.
| 0.700 |
| valid |
| 1 |
| page=1,block=1 |
| 0.700 |
| valid |
| 2 |
| page=2,block=0 |
| 0.700 |
| valid |
| 1 |
| page=1,block=1 |
| 0.700 |
| valid |
| 2 |
| page=2,block=0 |
| 0.700 |
| valid |