158 extractive question-and-answer pairs built from EM reports, published by newmangaloreport.gov.in. Every answer is a verbatim span of text the source prints, and each row carries the passage it sits in, its offset in that passage, the source quote, the page and the location in the document, so any row can be checked against the original. 40 of the 158 pairs (25.3%) are explanatory questions and 118 restate a figure. 96.20% of rows pass the corpus quality gate.
Use the API URL with your free DD token in notebooks, scripts, and pipelines.
https://www.desidata.in/api/datasets/environmental-monitoring-reports-by-new-mangalore-port-authority-question-and/downloadDataset downloads are free. For Python or API downloads, sign in once and create a free DD token; set it as DD_TOKEN or save it in your notebook's secrets. Requests are linked to your account so your download history and counts stay accurate.
# One-time install: pip install desidata
# Set DD_TOKEN in your environment first (create a free token in Profile & settings).
import desidata
df = desidata.load("environmental-monitoring-reports-by-new-mangalore-port-authority-question-and")
df.head()Sign in with Google to download.
Usable for analysis, but expect some cleaning before you rely on it.
New Mangalore Port Authority Environment Test Reports (March 2025) - Question and Answer Dataset
Economy · 25 rows
Stevedoring and Shore Handling Policy - Question and Answer Dataset
Economy · 285 rows
Half Yearly EC Compliance Report - Question and Answer Dataset
Economy · 32 rows
New Mangalore Port Authority Environment Test Reports (October 2025) - Question and Answer Dataset
Economy · 89 rows
Annual Report 2015-16 by agriwelfare.gov.in - Question and Answer Dataset
Economy · 1,013 rows
Higher Education in India - Question and Answer Dataset
Economy · 1,594 rows
Gender Policy of NABARD - Question and Answer Dataset
Economy · 14 rows
ICAR Annual Report 2025-26 - Question and Answer Dataset
Economy · 1,101 rows
First 10 of 158 rows
| question | answer | context | answer_start | question_type | knowledge_quality_score | source_quote | source_page | source_location | confidence | validation_status |
|---|---|---|---|---|---|---|---|---|---|---|
| What was the result for Phenolic Compound during the analysis? | not detected during the analysis | The Faecal Coliform is found 78.5 MPN/100 ml only. The Phenolic Compound is not detected during the analysis. 5.4.2Sewage Collection Water During the study period, at this location, pH was found between 7.02 to 7.20. | 76 | definition | 1.000 | The Phenolic Compound is not detected during the analysis. | 48 | page=48,ocr=1 | 0.850 | valid |
| What does the Pitot tube measure when inserted into a chimney or duct? | the velocity of air — stream | Temperature measurement 1 Connect the thermocouple lead to panel box assemble by inserting the dual plug. 2 Switch on the pyrometer to note down the ambient temperature 3. Insert thermocouple sensor into the stack through the hole provided on the stack. 4 Allow temperature to stabilize for 10 minutes then read the on the pyrometer. 5 Remover the thermocouple from the stack hole. 7.4.3. Velocity Measurement Digital manometer to measure the velocity of air — stream inside the chimney or duct. The Pitot tube inserted into a stack develops a differential pressure proportional to the kinetic head of the smoke-stream. Velocity of Gases V =KVHXTs 7.4.3.3. Sampling for SPM and Gaseous Pollutant Loading of thimble in thimble holder Open the thimble holder by unscrewing the front end Push the thimble (open end) on the conical surface. | 439 | definition | 1.000 | Velocity Measurement Digital manometer to measure the velocity of air — stream inside the chimney or duct. | 75 | page=75,ocr=1 | 0.700 | valid |
| What is the function of the pressure switch knob? | determination of pressure drop at the metering point by turning the knob towards PM and gas side. | Set an appropriate flow for gaseous sampling on the 3 LPM flow meter. Gaseous sampling rate should be between 1 to 2 the gaseous sampling rate from the iso-kinetic sampling rate and the balance set on 30 LPM flow meter. Flow for PM should always be adjusted after the flow adjusted for gaseous sampling. Pressure switch knob can be use for determination of pressure drop at the metering point by turning the knob towards PM and gas side. The corresponding redoubt is given on the vacuum gauge. Calculation Volume of air sampled Qm (lit) = 760 273+Ta PM = 7. Page 75 | 340 | definition | 1.000 | Pressure switch knob can be use for determination of pressure drop at the metering point by turning the knob towards PM and gas side. The corresponding redoubt is given on the vacuum gauge. | 76 | page=76,ocr=1 | 0.700 | valid |
| What are measurements? | carried out in such a way that 1 meter away from the sources and 1 meter away from the edge of the roads | Noise measurements were made at 1.5 meter above the ground level and about 3 m away from the walls, buildings or other sound reflecting sources. The measurements were carried out in such a way that 1 meter away from the sources and 1 meter away from the edge of the roads. In order to reduce the disturbance from standing waves, the noise level measured were averaged over +0.5m each of at less three positions. | 167 | definition | 0.980 | The measurements were carried out in such a way that 1 meter away from the sources and 1 meter away from the edge of the roads. | 19 | page=19,ocr=1 | 0.850 | valid |
| What action is taken if monitoring results exceed limits on two consecutive days? | it shall be considered adequate reason to institute regular or continuous monitoring and further investigation. | Nickel (Ni), equivalent filter paper * Annual Arithmetic mean of minimum 104 measurements in a year at a particular site taken twice a week 24-haurly at uniform intervals. ** 24-hourly or 08-hourly or 01-hourly monitored values, as applicable, shall be complied with 98% of the time in a year. 2% of the time, they may exceed the limits but not on two consecutive days of monitoring. Note: Whenever and wherever monitoring result on two consecutive days of monitoring exceed the limits specified above for the respective category, it shall be considered adequate reason to institute regular or continuous monitoring and further investigation. | 531 | relationship | 0.970 | Note: Whenever and wherever monitoring result on two consecutive days of monitoring exceed the limits specified above for the respective category, it shall be considered adequate reason to institute regular or continuous monitoring and further investigation. | 13 | page=13,ocr=1 | 0.700 | valid |
| What does the environmental monitoring compliance report describe as the nature of the job? | Monitoring of Environmental Parameters on Air, Marine, Water, STP Water, Drinking Water, Noise, DG Stack as per KSPCB/CPCB Standards for the Years 2020-21 and 2021-22 | SIX MONTHLY ENVIRONMENTAL MONITORING COMPLIANCE REPORT FOR M/s NEW MANGALORE Name of Client: Name of Contractor: Work Order No: PORT AUTHORITY, KARNATAKA, INDIA M/s. NEW MANGALORE PORT AUTHORITY, KARNATAKA, INDIA M/s. NITYA LABORATORIES No.3/12/EMMP/CE/2020-21/TS Nature of Job: Monitoring of Environmental Parameters on Air, Marine, Water, STP Water, Drinking Water, Noise, DG Stack as per KSPCB/CPCB Standards for the Years 2020-21 and 2021-22 | 279 | summary | 0.970 | NITYA LABORATORIES No.3/12/EMMP/CE/2020-21/TS Nature of Job: Monitoring of Environmental Parameters on Air, Marine, Water, STP Water, Drinking Water, Noise, DG Stack as per KSPCB/CPCB Standards for the Years 2020-21 and 2021-22 | 2 | page=2,ocr=1 | 0.700 | valid |
| What is the goal of the environmental management plan developed by the New Mangalore Port Authority? | to protect the environment by minimizing the pollution impacts of the port activities and follows the sustainable development through environmental management performance | The major imports of the port are crude petroleum products, LPG raw cashew other liquid chemicals containerized cargo, coal, limestone, fertilizer, edible oil and cement. Environmental Management Plan Environmental Policy NMPA is an Iso 9001:2015; 14001-2015 & ISPS Compliant Port. NMPA is prepared to protect the environment by minimizing the pollution impacts of the port activities and follows the sustainable development through environmental management performance. Prevent and control pollution and maintain eco-friendly environment. Organize environment awareness among staff, user and visitors. Team up shop floor personnel, service providers and other stake holders to work towards pollution free environment. Being concerned towards environmental protection, NMPA has prepared an extensive environmental management plan for port operations. | 299 | summary | 0.970 | NMPA is prepared to protect the environment by minimizing the pollution impacts of the port activities and follows the sustainable development through environmental management performance. | ||||
| What is now a routine requirement for industrial units to manage emissions? | Monitoring of stack and vent emission | Many type of industries including thermal power station, cement plant, refineries, pulp and paper industries etc emitted so many types of poilutant in atmosphere monitor flue gas emission form stationary Monitoring of stack and vent emission is now becoming a routine requirement not only for large but even the medium and small industrial units. instrument / Accessories: 1) Panel Box Assembly 2) Vacuum pump 3) Dry gas meter 4) Cold box assembly 5) Pitot tube 6) Impingers 7) Nozzels 8) Sampling pobe 9) Inter connection tubings 10) Thimble holder KO 11) Pre-weighted Thimble | 12) Red oil ] Page 73 | 204 | summary | 0.970 | Many type of industries including thermal power station, cement plant, refineries, pulp and paper industries etc emitted so many types of poilutant in atmosphere monitor flue gas emission form stationary Monitoring of stack and vent emission is now becoming a routine requirement not only for large but even the medium and small industrial units. | 74 | page=74,ocr=1 | 0.700 | valid |
| What type of sample is described as being analyzed? | Wastewater (STP) | Name Of theClient:New Mangalore Port Authority Address Of theClient:Panambur ,Mangalore -575010 Sample Description: Wastewater (STP) RESULT OF WASTEWATER (STP) FOR SIX MONTHS APRIL 2022 TO SEPTEMBER 2022 SUMMARY Sr. | Parameters Unit Test Results Tolerance Protocol No. SBR TANK Limit as per KSPCB Minimum Maximum 4 TAZ 7.48 1$:3025 (P-11) pH (Aug. 2022) (Sep. 2022) 2 Hazen 48 (P-4) Colour (June 2022) Odour | Objectionable 1$:3025 (P-6) ma/L 26 1$:3025 (P-39) Oil & Grease (Aug. | 116 | definition | 0.940 | Name Of theClient:New Mangalore Port Authority Address Of theClient:Panambur ,Mangalore -575010 Sample Description: Wastewater (STP) RESULT OF WASTEWATER (STP) FOR SIX MONTHS APRIL 2022 TO SEPTEMBER 2022 SUMMARY Sr. | 52 | page=52,ocr=1 | 0.700 | valid |
| What is the measurement unit for Potassium as K? | mg/L | Calcium As Ca 336 376 1S:3025 (P-40) May Sep 350 | Sodium As Na 10116 10155 | (P-45) Apr Aug 10130 13 | Potassium As K mg/L 337 1S:3025 (P-45) Sep May 345 Nitrite 0.16 1S:3025 (P-34) Aug Apr 0.21 15 | Phosphate As P mg/L 0.062 0. (P-31) Apr June 0.073 16 | Silica As mg/L ND ND 15:3025 (P-35) Total Solids mg/L 44395 49208 46520 (P-15) 18 Total Nitrogen mg/L ND ND ND (P-34) 19 = Nitrogen mg/L ND ND ND (P-11) 20 Faecal Coliform MPN/100 MI 254 260 Sep July 7 | 119 | definition | 0.940 | Calcium As Ca 336 376 1S:3025 (P-40) May Sep 350 | Sodium As Na 10116 10155 | (P-45) Apr Aug 10130 13 | Potassium As K mg/L 337 1S:3025 (P-45) Sep May 345 Nitrite 0.16 1S:3025 (P-34) Aug Apr 0.21 15 | Phosphate As P mg/L 0.062 0. | 62 | page=62,ocr=1 | 0.700 | valid |
Read straight from the file — download or use the API URL for the full dataset.
| 5 |
| page=5,ocr=1 |
| 0.700 |
| valid |