67 extractive question-and-answer pairs built from Hycr March 2026, published by aai.aero. Every answer is a verbatim span of text the source prints, and each row carries the passage it sits in, its offset in that passage, the source quote, the page and the location in the document, so any row can be checked against the original. 26 of the 67 pairs (38.8%) are explanatory questions and 41 restate a figure. 95.52% of rows pass the corpus quality gate.
Use the API URL with your free DD token in notebooks, scripts, and pipelines.
https://www.desidata.in/api/datasets/environmental-management-and-mitigation-measures-question-and-answer-dataset/downloadDataset downloads are free. For Python or API downloads, sign in once and create a free DD token; set it as DD_TOKEN or save it in your notebook's secrets. Requests are linked to your account so your download history and counts stay accurate.
# One-time install: pip install desidata
# Set DD_TOKEN in your environment first (create a free token in Profile & settings).
import desidata
df = desidata.load("environmental-management-and-mitigation-measures-question-and-answer-dataset")
df.head()Sign in with Google to download.
Usable for analysis, but expect some cleaning before you rely on it.
Half Yearly Compliance Report June to Dec, 2025 - Question and Answer Dataset
Economy · 286 rows
Noise Mapping Final Report Bhubaneswar Airport - Question and Answer Dataset
Economy · 70 rows
Noise Mapping of Dehradun Airport - Question and Answer Dataset
Economy · 76 rows
Noise Mapping at Birsi Airport - Question and Answer Dataset
Economy · 97 rows
Annual Report 2015-16 by agriwelfare.gov.in - Question and Answer Dataset
Economy · 1,013 rows
Higher Education in India - Question and Answer Dataset
Economy · 1,594 rows
Gender Policy of NABARD - Question and Answer Dataset
Economy · 14 rows
ICAR Annual Report 2025-26 - Question and Answer Dataset
Economy · 1,101 rows
First 10 of 67 rows
| question | answer | context | answer_start | question_type | knowledge_quality_score | source_quote | source_page | source_location | confidence | validation_status |
|---|---|---|---|---|---|---|---|---|---|---|
| What accompanies the submission to address air pollution issues during material transportation? | a document with pictures of the covered truck | PPs Submission: Being Complied To prevent air pollution issues during these operations, excavated materials are handled and transported using the proper precautions, such as tarpaulin covering, controlled loading and unloading, and regulated vehicle movement. Enclosed is a document with pictures of the covered truck. Date: 14/05/2026 AIR QUALITY MONITORING AND The soil/construction materials carried by the vehicle should be covered by impervious sheeting to ensure that the dusty materials do 15 Address: IA Division, Ministry of Environment, Forest and Climate Change, Indira Paryavaran Bhawan, Jor Bagh New Delhi - 110003 Page 13 of 23 | 272 | definition | 1.000 | Enclosed is a document with pictures of the covered truck. | 13 | page=13,block=13 | 0.850 | valid |
| What is the goal of the Environment Management Plan under Corporate Environmental Responsibility? | to address the environmental problems in the project region, indicating both physical and financial targets year wise | All submissions made before the competent authority are true, factual, and complete. The Proponent is scrupulously adhering to the provisions of the EIA Notification, 2006, along with all other applicable regulations governing the project. Date: 14/05/2026 21 Corporate Environmental Responsibility As per OM no F.No.22-65/2017-IA.III dated 30th September 2020, under Corporate Environmental Responsibility (CER) the Project Proponent shall prepare an Environment Management Plan (EMP) as directed by SEAC during appraisal, covering the issues to address the environmental problems in the project region, indicating both physical and financial targets year wise. The EMP shall be implemented in consultation with local self Govt. Institutions. The indicated cost for CER shall be 2 percentage of the project cost depending upon the nature of activities proposed. | 544 | definition | 1.000 | Date: 14/05/2026 21 Corporate Environmental Responsibility As per OM no F.No.22-65/2017-IA.III dated 30th September 2020, under Corporate Environmental Responsibility (CER) the Project Proponent shall prepare an Environment Management Plan (EMP) as directed by SEAC during appraisal, covering the issues to address the environmental problems in the project region, indicating both physical and financial targets year wise. | ||||
| What is the goal of the environmental mitigation measures implemented during material handling and transportation? | to mitigate the fugitive emission while handling and transporting the material | PPs Submission: Being Complied The EC Letter number 370/EC1/2023/SEIAA, dated July 11, 2024, contains general and specific requirements that the PP has been strictly adhering to. Date: 14/05/2026 45 Statutory compliance PP shall strictly comply with General and specific condition given in EC Letter no. 370/EC1/2023/SEIAA dated 11.07.2024. PPs Submission: Being Complied The PP has been following the general condition and specific conditions in the EC Letter number 370/EC1/2023/SEIAA dated 11.07.2024 scrupulously. Date: 14/05/2026 46 AIR QUALITY MONITORING AND PRESERVATION All environmental mitigations measures shall be taken to mitigate the fugitive emission while handling and transporting the material. PPs Submission: Complied The Project Proponent has adopted comprehensive measures to prevent fugitive emissions during the transportation of materials. | 632 | definition | 1.000 | Date: 14/05/2026 46 AIR QUALITY MONITORING AND PRESERVATION All environmental mitigations measures shall be taken to mitigate the fugitive emission while handling and transporting the material. | 9 | |||
| What kind of soil is required to maintain the stability of the RESA platform? | soil which compacts well and stays firm over time | MONITORING AND PRESERVATION the fugitive emission while handling and transporting the material PPs Submission: Being Complied The PP has made every effort to stop fugitive emissions during material transportation. The project area is protected by appropriate barricades of a specific height, the vehicles transporting materials are covered with tarpaulins, and water is sprayed on the site to reduce dust emissions. Date: 14/05/2026 55 MISCELLANEOUS The PP shall ensure that soil which compacts well and stays firm over time is used, so that the RESA platform remains stable and does not become loose PPs Submission: Being Complied The Project Proponent has been conducting systematic testing of the soil extracted from the mining area. | 475 | definition | 1.000 | Date: 14/05/2026 55 MISCELLANEOUS The PP shall ensure that soil which compacts well and stays firm over time is used, so that the RESA platform remains stable and does not become loose PPs Submission: Being Complied The Project Proponent has been conducting systematic testing of the soil extracted from the mining area. | 11 | page=11,block=0 | ||
| What is the responsibility of the Environmental Management Cell? | monitoring the overall management of environmental conditions stipulated in the Environmental Clearance (EC) and ensuring their implementation at the site | This framework ensures that any infringements or deviations from stipulated environmental conditions are promptly identified and effectively addressed, thereby maintaining strict compliance. A copy of the Environmental Policy is attached as a supporting document. Date: 15/05/2026 52 MISCELLANEOUS A separate Environmental Cell both at the project and company head quarter level, with qualified personnel shall be set up under the control of senior Executive, who will directly report to the head of the organization. PPs Submission: Complied A separate Environmental Management Cell (EMC) has been constituted at both the project level and the headquarters level. The EMC comprises skilled environmental professionals responsible for monitoring the overall management of environmental conditions stipulated in the Environmental Clearance (EC) and ensuring their implementation at the site. | 735 | definition | 1.000 | The EMC comprises skilled environmental professionals responsible for monitoring the overall management of environmental conditions stipulated in the Environmental Clearance (EC) and ensuring their implementation at the site. | ||||
| What are All excavation works? | carried out under the supervision of skilled personnel to maintain environmental safeguards and regulatory compliance | PPs Submission: Being Complied The Project Proponent ensures that excavation activities do not hinder the natural flow of the area and that no alteration to the existing drainage pattern occurs. All excavation works are carried out under the supervision of skilled personnel to maintain environmental safeguards and regulatory compliance. Date: 14/05/2026 5 WATER QUALITY MONITORING AND PRESERVATION The treated wastewater should be recycled for green belt, cooling system, flushing etc. | 220 | definition | 0.980 | All excavation works are carried out under the supervision of skilled personnel to maintain environmental safeguards and regulatory compliance. | 2 | page=2,block=6 | 0.850 | valid |
| Why are soil stockpiles designed with specific slopes? | to ensure stability and compliance with environmental regulations | Ensure that soil stockpiles are designed with no slope greater than 2:1 (horizontal /vertical). PPs Submission: Being Complied By using suitable covering, watering, and containment techniques, soil stockpiles have been managed to reduce dust emissions and sediment runoff. In order to ensure stability and compliance with environmental regulations, all soil stockpiles have been designed with slopes that do not exceed 2:1. | 282 | relationship | 0.970 | In order to ensure stability and compliance with environmental regulations, all soil stockpiles have been designed with slopes that do not exceed 2:1. | 16 | page=16,block=0 | 0.700 | valid |
| To whom does the site maintenance engineer report regularly? | the project manager at the site | The site maintenance engineer is designated as the responsible officer to oversee all environmental management activities and to report regularly to the project manager at the site. A copy of the organogram of the EMC is attached as a supporting document. | 149 | relationship | 0.970 | The site maintenance engineer is designated as the responsible officer to oversee all environmental management activities and to report regularly to the project manager at the site. | 20 | page=20,block=0 | 0.700 | valid |
| What actions are being taken to handle solid waste at the project site? | The solid waste generated at the project site is being systematically collected and segregated. | Date: 14/05/2026 9 WASTE MANAGEMENT The solid waste generated should be properly collected, segregated and disposed as per the provision of Solid Waste (Management and Handling) Rules, 2016. PPs Submission: Being Complied The solid waste generated at the project site is being systematically collected and segregated. The PP has earmarked a designated area for segregation and management of solid waste. All operations are being carried out in strict adherence to the provisions of the Solid Waste Management Rules, 2016. | 222 | summary | 0.970 | PPs Submission: Being Complied The solid waste generated at the project site is being systematically collected and segregated. The PP has earmarked a designated area for segregation and management of solid waste. | 3 | page=3,block=0 | 0.700 | valid |
| What is the goal of reusing treated water from the Sewage Treatment Plant? | Water resource conservation and sustainable use | PPs Submission: Agreed to Comply In accordance with the proposal's specifications, a Sewage Treatment Plant (STP) will be built to handle all wastewater produced by airport operations. Water resource conservation and sustainable use will be ensured by reusing the treated water for horticulture, flushing, filter backwash, HVAC needs, and dust suppression. Date: 14/05/2026 23 WATER QUALITY MONITORING AND PRESERVATION A certificate from the competent authority for discharging treated effluent/ untreated effluents into the Public sewer/ disposal/drainage systems along with the final disposal point should be obtained. | 185 | summary | 0.970 | PPs Submission: Agreed to Comply In accordance with the proposal's specifications, a Sewage Treatment Plant (STP) will be built to handle all wastewater produced by airport operations. Water resource conservation and sustainable use will be ensured by reusing the treated water for horticulture, flushing, filter backwash, HVAC needs, and dust suppression. | 15 | page=15,block=0 | 0.700 | valid |
Read straight from the file — download or use the API URL for the full dataset.
| 5 |
| page=5,block=0 |
| 0.700 |
| valid |
| page=9,block=0 |
| 0.700 |
| valid |
| 0.700 |
| valid |
| 20 |
| page=20,block=0 |
| 0.700 |
| valid |