42 extractive question-and-answer pairs built from Microsoft Word - B N 16- EC Compliance 03.06.25, published by newmangaloreport.gov.in. Every answer is a verbatim span of text the source prints, and each row carries the passage it sits in, its offset in that passage, the source quote, the page and the location in the document, so any row can be checked against the original. 20 of the 42 pairs (47.6%) are explanatory questions and 22 restate a figure. 100.00% of rows pass the corpus quality gate.
Use the API URL with your free DD token in notebooks, scripts, and pipelines.
https://www.desidata.in/api/datasets/environmental-clearance-compliance-at-new-mangalore-port-question-and-answer/downloadDataset downloads are free. For Python or API downloads, sign in once and create a free DD token; set it as DD_TOKEN or save it in your notebook's secrets. Requests are linked to your account so your download history and counts stay accurate.
# One-time install: pip install desidata
# Set DD_TOKEN in your environment first (create a free token in Profile & settings).
import desidata
df = desidata.load("environmental-clearance-compliance-at-new-mangalore-port-question-and-answer")
df.head()Sign in with Google to download.
Usable for analysis, but expect some cleaning before you rely on it.
New Mangalore Port Authority Environment Test Reports (March 2025) - Question and Answer Dataset
Economy · 25 rows
Stevedoring and Shore Handling Policy - Question and Answer Dataset
Economy · 285 rows
Half Yearly EC Compliance Report - Question and Answer Dataset
Economy · 32 rows
New Mangalore Port Authority Environment Test Reports (October 2025) - Question and Answer Dataset
Economy · 89 rows
Annual Report 2015-16 by agriwelfare.gov.in - Question and Answer Dataset
Economy · 1,013 rows
Higher Education in India - Question and Answer Dataset
Economy · 1,594 rows
Gender Policy of NABARD - Question and Answer Dataset
Economy · 14 rows
ICAR Annual Report 2025-26 - Question and Answer Dataset
Economy · 1,101 rows
First 10 of 42 rows
| question | answer | context | answer_start | question_type | knowledge_quality_score | source_quote | source_page | source_location | confidence | validation_status |
|---|---|---|---|---|---|---|---|---|---|---|
| What is the treated water from the terminal's STP used for? | used for gardening purpose 3 | The terminal has installed 8KLD STP. The treated water is used for gardening purpose 3.10 No diversion of the natural course of the river shall be made without prior permission from the Ministry of water resources. | 58 | definition | 1.000 | The treated water is used for gardening purpose 3. | 6 | page=6,block=0 | 0.850 | valid |
| What are the consequences of concealing factual data or submitting false information? | revocation of this environmental clearance and attract action under the provisions of Environment (protection) Act, 1986 | Noted 11.9 No further expansion or modification in t he project shall be carried out without prior approval of the Ministry of Environment, Forest and climate change (MoEF & CC) Noted 11.10 Concealing factual data or submission of false/fabricated dada may result in revocation of this environmental clearance and attract action under the provisions of Environment (protection) Act, 1986. Noted 11.11 The Ministry may revoke or suspend the clearance , if implementation of any of the above conditions is not satisfactory under the provisions of the Environmental (protection) Act 1986, to ensure effective implementation of the suggested safeguard measures in a time bound and satisfactory manner. | 267 | relationship | 0.970 | Concealing factual data or submission of false/fabricated dada may result in revocation of this environmental clearance and attract action under the provisions of Environment (protection) Act, 1986. | 11 | page=11,block=10 | 0.800 | valid |
| What actions have been taken to manage air pollution at the terminal? | appropriate air pollution control (APC) measures have been implemented at all vulnerable points, including sources of fugitive dust. | 1. Appropriate Air Pollution Control (APC) system shall be provided for all the dust generating points including fugitive dust from all vulnerable sources, so as to comply prescribed fugitive emission standards. All the dust generation sources have been identified and the Air pollution mitigative measures have been taken. The terminal is complying to fugitive Emission standards, the monitoring values are well within the limits prescribed by the board. All dust-generating sources within the terminal have been identified and appropriate air pollution control (APC) measures have been implemented at all vulnerable points, including sources of fugitive dust. The terminal is in full compliance with the prescribed fugitive emission standards and monitoring results consistently remain well within the limits set by the Karnataka State Pollution Control Board(KSPCB) 1. | 529 | summary | 0.970 | All dust-generating sources within the terminal have been identified and appropriate air pollution control (APC) measures have been implemented at all vulnerable points, including sources of fugitive dust. The terminal is in full compliance with the prescribed fugitive emission standards and monitoring results consistently remain well within the limits set by the Karnataka State Pollution Control Board(KSPCB) 1. | ||||
| What is the purpose of shrouding at the work site? | This will act as dust curtain as well achieving zero dust discharge from the site. | Appropriate Air Pollution Control (APC) system shall be provided for all dust generating points including fugitive dust from all vulnerable sources, so as to comply prescribed emission standards. The dust generating sources have been identified and appropriate mitigative measures are taken to avoid fugitive emissions. 2. Shrouding shall be carried out in the work site enclosing the dock/proposed facility area. This will act as dust curtain as well achieving zero dust discharge from the site. | 414 | summary | 0.970 | Shrouding shall be carried out in the work site enclosing the dock/proposed facility area. This will act as dust curtain as well achieving zero dust discharge from the site. | 4 | page=4,block=0 | 0.700 | valid |
| What is the function of the curtain or shroud used in dry dock operations? | restricting disturbance from wind in affecting the dry dock operations, preventing waste dispersion, improving working conditions through provision of shade for the workers. | These curtain or shroud will be immensely effective in restricting disturbance from wind in affecting the dry dock operations, preventing waste dispersion, improving working conditions through provision of shade for the workers. Noted 2. Dust collectors shall be deployed in all areas where blasting (surface cleaning ) and painting operations are to be carried out, supplemented by stacks for effective dispersion. Noted 2. The vessels shall comply the emission norms prescribed from time to time Noted 2. Diesel power generating sets proposed as source of backup power should be of enclosed type and conform to rules made under the Environment (Protection) Act, 1986. The height of stack of DG sets should be equal to the height needed for the combined capacity of all proposed DG sets. Use of low sulphur diesel. | 55 | summary | 0.970 | These curtain or shroud will be immensely effective in restricting disturbance from wind in affecting the dry dock operations, preventing waste dispersion, improving working conditions through provision of shade for the workers. Noted 2. | ||||
| What maintenance measures are advised for reducing noise from equipment on-site? | Equipment should be regularly serviced. Attention should also be given to muffler maintenance and enclosure of noisy equipments. | Sl.No. EC Conditions Status of Compliance 4. Noise level survey shall be carried as per the prescribed guidelines and report in this regard shall be submitted to regional Officer of the Ministry as a part of six-monthly compliance report. The terminal is monitoring noise levels at various locations at Berth no.16 in accordance with prescribed guidelines. The monitoring reports are being submitted to KSPCB, RO, Mangalore periodically 4. Noise from vehicles, power machinery and equipment on-site should not exceed the prescribed limit. Equipment should be regularly serviced. Attention should also be given to muffler maintenance and enclosure of noisy equipments. Noted 4. Acoustic enclosures for DG sets, noise barriers for ground-run bays, ear plugs for operating personnel shall be implemented as mitigation measures for noise impact due to ground sources. Complied 4. | 539 | summary | 0.970 | Noise from vehicles, power machinery and equipment on-site should not exceed the prescribed limit. Equipment should be regularly serviced. Attention should also be given to muffler maintenance and enclosure of noisy equipments. Noted 4. | ||||
| What must be ensured about water traffic to protect aquatic wildlife sanctuaries? | water traffic does not impact the aquatic wildlife sanctuaries that fall along the stretch of the river. | HALF YEARLY COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE FOR ENHANCEMENT OF CARGO HANDLING CAPACITY FROM 6. MTPA TO 8. MTPA OF EXCISTING OPERATIONAL BERTH NO 16 EC NO: 24A3501KA5159064N Dated 15.11.2024 dunes, fisheries, echinoderms, shrimps, turtle, corals, coastal vegetation, mangroves and other marine biodiversity components including all micro, macro and mega floral and faunal components of marine biodiversity. 8. The project proponent shall ensure that water traffic does not impact the aquatic wildlife sanctuaries that fall along the stretch of the river. Noted 9. Public Hearing and Human Health Issues Sl.No EC Conditions Status of Compliance 9. | 463 | summary | 0.970 | The project proponent shall ensure that water traffic does not impact the aquatic wildlife sanctuaries that fall along the stretch of the river. Noted 9. | 9 | page=9,block=0 | 0.700 | valid |
| What measures should be taken when repairing old vessels? | excessive care shall be taken while handling Asbestos & Freon gas. | The work space shall be maintained as per international standards for occupational health and safety with provision of fresh air respirators, blowers and fans to prevent any accumulation and inhalation of undesirable levels of pollutants including VOCs. Noted 9. Workers shall be strictly enforced to wear personal protective equipments like dust mask, ear muffs or ear plugs, whenever and wherever necessary/ required. Special visco-elastic gloves will be used by labour exposed to hazards from vibration. Noted 9. In case of repair of any old vessels, excessive care shall be taken while handling Asbestos & Freon gas. Besides, fully enclosed covering should be provided for the temporary storage of asbestos material site before disposal to CTSDF Noted 9. | 554 | summary | 0.970 | In case of repair of any old vessels, excessive care shall be taken while handling Asbestos & Freon gas. Besides, fully enclosed covering should be provided for the temporary storage of asbestos material site before disposal to CTSDF Noted 9. | 9 | page=9,block=0 | 0.700 | valid |
| What is implemented to prevent the occurrence of accidents or untoward incidents? | All standard safety and occupational hazard measures | Safety training shall be given to all workers specific to their work area and every worker and employee will be engaged in fire hazard awareness training and mock drills which will be conducted regularly. All standard safety and occupational hazard measures shall be implemented and monitored by the concerned officials to prevent the occurrence of untoward incidents/accidents Noted/Mock Drills are being conducted regularly. We are practicing 1. Apex Safety Committee 2. Safety Policy 3. Monthly Safety Theme/ Program Training are imparted to all employees on safety and health aspects. 9. Emergency preparedness plan based on the Hazard Identification and Risk Assessment (HIRA) and Disaster Management Plan shall be implemented. Noted/HIRA is in practice 9. | 205 | summary | 0.970 | Safety training shall be given to all workers specific to their work area and every worker and employee will be engaged in fire hazard awareness training and mock drills which will be conducted regularly. All standard safety and occupational hazard measures shall be implemented and monitored by the concerned officials to prevent the occurrence of untoward incidents/accidents Noted/Mock Drills are being conducted regularly. | ||||
| What measures are mentioned to prevent spillage of fuel and lubricants? | suitable precautions and also by providing necessary mechanisms to trap the spillage | The project proponents will draw up and implement a plan for the management of temperature differences between intake waters and discharge waters. Noted 3. Spillage of fuel/engine oil and lubricants from the construction site are a source of organic pollution which impacts marine life. This shall be prevented by suitable precautions and also by providing necessary mechanisms to trap the spillage. Noted 3. Total fresh water use shall not exceed the proposed requirement as provided in the project details. Prior permission from Competent Authority shall be obtained for use of fresh water. Noted 3. Sewage treatment Plant shall be provided to treat the waste water generated from the project. Treated water shall be reused for horticulture, flushing, backwash, HVAC purposes and dust suppression. Noted | 314 | summary | 0.970 | This shall be prevented by suitable precautions and also by providing necessary mechanisms to trap the spillage. | 5 | page=5,block=0 | 0.700 | valid |
Read straight from the file — download or use the API URL for the full dataset.
| 2 |
| page=2,block=5 |
| 0.700 |
| valid |
| 4 |
| page=4,block=0 |
| 0.700 |
| valid |
| 6 |
| page=6,block=9 |
| 0.700 |
| valid |
| 9 |
| page=9,block=0 |
| 0.700 |
| valid |