47 extractive question-and-answer pairs built from Environment Clearance for Construction of Liquid Cargo Jetty(Berth No.13) in the existing Oil Dock Arm of New Mangalore Port 0, published by newmangaloreport.gov.in. Every answer is a verbatim span of text the source prints, and each row carries the passage it sits in, its offset in that passage, the source quote, the page and the location in the document, so any row can be checked against the original. 10 of the 47 pairs (21.3%) are explanatory questions and 37 restate a figure. 93.62% of rows pass the corpus quality gate.
Use the API URL with your free DD token in notebooks, scripts, and pipelines.
https://www.desidata.in/api/datasets/environment-clearance-for-liquid-cargo-jetty-at-new-mangalore-port-question-and/downloadDataset downloads are free. For Python or API downloads, sign in once and create a free DD token; set it as DD_TOKEN or save it in your notebook's secrets. Requests are linked to your account so your download history and counts stay accurate.
# One-time install: pip install desidata
# Set DD_TOKEN in your environment first (create a free token in Profile & settings).
import desidata
df = desidata.load("environment-clearance-for-liquid-cargo-jetty-at-new-mangalore-port-question-and")
df.head()Sign in with Google to download.
Usable for analysis, but expect some cleaning before you rely on it.
New Mangalore Port Authority Environment Test Reports (March 2025) - Question and Answer Dataset
Economy · 25 rows
Stevedoring and Shore Handling Policy - Question and Answer Dataset
Economy · 285 rows
Half Yearly EC Compliance Report - Question and Answer Dataset
Economy · 32 rows
New Mangalore Port Authority Environment Test Reports (October 2025) - Question and Answer Dataset
Economy · 89 rows
Annual Report 2015-16 by agriwelfare.gov.in - Question and Answer Dataset
Economy · 1,013 rows
Higher Education in India - Question and Answer Dataset
Economy · 1,594 rows
Gender Policy of NABARD - Question and Answer Dataset
Economy · 14 rows
ICAR Annual Report 2025-26 - Question and Answer Dataset
Economy · 1,101 rows
First 10 of 47 rows
| question | answer | context | answer_start | question_type | knowledge_quality_score | source_quote | source_page | source_location | confidence | validation_status |
|---|---|---|---|---|---|---|---|---|---|---|
| How should sewage in the port area be disposed of? | through septic tank — soak pit system or shall be treated alongwith the industrial effluents | (vii) The Relocation of the fishermen and communities, if any, in the area shall be done strictly in accordance with the norms prescribed by the State Government. The relocated communities shall be provided with all facilities including health care, education, sanitation and livelihood. (viii) The project proponent shall not undertake any destruction of mangroves during construction and operation of the project. (ix) Sewage arising in the port area shall be disposed off through septic tank — soak pit system or shall be treated alongwith the industrial effluents to conform to the standards stipulated by Karnataka Pollution Control Board and shall be utilized/re-cycled for gardening, plantation and irrigation. (x) Project proponent shall prepare and regularly update the Disaster Management Plan from time to time. | 475 | summary | 0.970 | (ix) Sewage arising in the port area shall be disposed off through septic tank — soak pit system or shall be treated alongwith the industrial effluents to conform to the standards stipulated by Karnataka Pollution Control Board and shall be utilized/re-cycled for gardening, plantation and irrigation. | 2 | page=2,ocr=1 | 0.700 | valid |
| What is the purpose of the proposed project by the New Mangalore Port Trust? | construction a liquid cargo jetty in the existing NMPT | = Government of India Ministry of Environment and Forests \ (1A-ILi Division) Paryavaran Bhavan, C.G. Complex, Lodi Road, | New Delhi-1 10003 Dated the 29" July, 2008 A Sub: of Liquid Cargo Jetty (Berth No.13) in the existing Oil Dock Arm of New Mangalore Port, Karnata M/s New Mangalore Port Trust — regarding. Reference is invited to the letter No.CE/EE(DEV)/WDA/2006-07, dated 31.5. No.10/2/B- 13/ENV/MW/2007-08, dated 14.2. No.22/2/B-13/ENV/MW/07-08, dated 22.4.2008 and dated 10.6.2008 from M/s New Mangalore Port Trust (NMPT) regarding the subject mentioned. 2. The project is for construction a liquid cargo jetty in the existing NMPT. An area of 20 acres of the port land will be utilized for the project and water front of 400 mts. The entire area is within the port limits. The proposed jetty will accommodate vessels upto LOA of 300 m. | 587 | summary | 0.970 | The project is for construction a liquid cargo jetty in the existing NMPT. | 1 | page=1,ocr=1 | 0.700 | valid |
| How should sewage in the port area be managed? | disposed off through septic tank — soak pit system or shall be treated alongwith the industrial effluents | (vii) The Relocation of the fishermen and communities, if any, in the area shall be done strictly in accordance with the norms prescribed by the State Government. The relocated communities shall be provided with all facilities including health care, education, sanitation and livelihood. (viii) The project proponent shall not undertake any destruction of mangroves during construction and operation of the project. (ix) Sewage arising in the port area shall be disposed off through septic tank — soak pit system or shall be treated alongwith the industrial effluents to conform to the standards stipulated by Karnataka Pollution Control Board and shall be utilized/re-cycled for gardening, plantation and irrigation. (x) Project proponent shall prepare and regularly update the Disaster Management Plan from time to time. | 462 | summary | 0.970 | (ix) Sewage arising in the port area shall be disposed off through septic tank — soak pit system or shall be treated alongwith the industrial effluents to conform to the standards stipulated by Karnataka Pollution Control Board and shall be utilized/re-cycled for gardening, plantation and irrigation. | 2 | |||
| What is the purpose of the project mentioned in the document? | construction a liquid cargo jetty in the existing NMPT | = Government of India Ministry of Environment and Forests \ (1A-ILi Division) Paryavaran Bhavan, C.G. Complex, Lodi Road, | New Delhi-1 10003 Dated the 29" July, 2008 A Sub: of Liquid Cargo Jetty (Berth No.13) in the existing Oil Dock Arm of New Mangalore Port, Karnata M/s New Mangalore Port Trust — regarding. Reference is invited to the letter No.CE/EE(DEV)/WDA/2006-07, dated 31.5. No.10/2/B- 13/ENV/MW/2007-08, dated 14.2. No.22/2/B-13/ENV/MW/07-08, dated 22.4.2008 and dated 10.6.2008 from M/s New Mangalore Port Trust (NMPT) regarding the subject mentioned. 2. The project is for construction a liquid cargo jetty in the existing NMPT. An area of 20 acres of the port land will be utilized for the project and water front of 400 mts. The entire area is within the port limits. The proposed jetty will accommodate vessels upto LOA of 300 m. | 587 | summary | 0.970 | The project is for construction a liquid cargo jetty in the existing NMPT. | 1 | page=1,ocr=1 | 0.700 | valid |
| What facilities must be provided for construction workers to prevent environmental damage during the construction phase? | Adequate provisions for infrastructure facilities such as water supply, fuel, sanitation etc. | (ii) Adequate provisions for infrastructure facilities such as water supply, fuel, sanitation etc. shall be ensured for construction workers during the construction phase of the project so as to avoid felling of trees/mangroves and pollution of water and the surroundings. | 5 | list | 0.820 | (ii) Adequate provisions for infrastructure facilities such as water supply, fuel, sanitation etc. shall be ensured for construction workers during the construction phase of the project so as to avoid felling of trees/mangroves and pollution of water and the surroundings. | 2 | page=2,ocr=1 | 0.700 | valid |
| What facilities must be provided to relocated communities in the area? | health care, education, sanitation and livelihood | (vii) The Relocation of the fishermen and communities, if any, in the area shall be done strictly in accordance with the norms prescribed by the State Government. The relocated communities shall be provided with all facilities including health care, education, sanitation and livelihood. (viii) The project proponent shall not undertake any destruction of mangroves during construction and operation of the project. (ix) Sewage arising in the port area shall be disposed off through septic tank — soak pit system or shall be treated alongwith the industrial effluents to conform to the standards stipulated by Karnataka Pollution Control Board and shall be utilized/re-cycled for gardening, plantation and irrigation. (x) Project proponent shall prepare and regularly update the Disaster Management Plan from time to time. | 237 | list | 0.820 | The relocated communities shall be provided with all facilities including health care, education, sanitation and livelihood. | 2 | page=2,ocr=1 | 0.700 | valid |
| What must be provided to relocated communities in the project area? | all facilities including health care, education, sanitation and livelihood | (vii) The Relocation of the fishermen and communities, if any, in the area shall be done strictly in accordance with the norms prescribed by the State Government. The relocated communities shall be provided with all facilities including health care, education, sanitation and livelihood. (viii) The project proponent shall not undertake any destruction of mangroves during construction and operation of the project. (ix) Sewage arising in the port area shall be disposed off through septic tank — soak pit system or shall be treated alongwith the industrial effluents to conform to the standards stipulated by Karnataka Pollution Control Board and shall be utilized/re-cycled for gardening, plantation and irrigation. (x) Project proponent shall prepare and regularly update the Disaster Management Plan from time to time. | 212 | list | 0.820 | The relocated communities shall be provided with all facilities including health care, education, sanitation and livelihood. | 2 | page=2,ocr=1 | 0.700 | valid |
| What provisions must be ensured for construction workers during the construction phase? | infrastructure facilities such as water supply, fuel, sanitation etc. | (ii) Adequate provisions for infrastructure facilities such as water supply, fuel, sanitation etc. shall be ensured for construction workers during the construction phase of the project so as to avoid felling of trees/mangroves and pollution of water and the surroundings. | 29 | list | 0.820 | (ii) Adequate provisions for infrastructure facilities such as water supply, fuel, sanitation etc. shall be ensured for construction workers during the construction phase of the project so as to avoid felling of trees/mangroves and pollution of water and the surroundings. | 2 | page=2,ocr=1 | 0.700 | valid |
| What facilities must project authorities provide for environmental monitoring during the operational phase? | an environmental laboratory well equipped with standard equipment and facilities and qualified manpower | (iv) The proponents shall provide for a regular monitoring mechanism so as to ensure that the treated effluents conform to the prescribed standards. The records of analysis reports must be properly maintained and made available for inspection to the concerned State/Central officials during their visits. (v) In order to carry out the environmental monitoring during the operational phase of the project, the project authorities shall provide an environmental laboratory well equipped with standard equipment and facilities and qualified manpower to carry out the testing of various environmental parameters. (vi) The sand dunes and mangroves, if any, on the site shall not be disturbed in any way. | 443 | list | 0.820 | (v) In order to carry out the environmental monitoring during the operational phase of the project, the project authorities shall provide an environmental laboratory well equipped with standard equipment and facilities and qualified manpower to carry out the testing of various environmental parameters. | 2 | page=2,ocr=1 | ||
| What infrastructure facilities must be ensured for construction workers? | water supply, fuel, sanitation | (ii) Adequate provisions for infrastructure facilities such as water supply, fuel, sanitation etc. shall be ensured for construction workers during the construction phase of the project so as to avoid felling of trees/mangroves and pollution of water and the surroundings. | 63 | list | 0.740 | (ii) Adequate provisions for infrastructure facilities such as water supply, fuel, sanitation etc. | 2 | page=2,ocr=1 | 0.700 | valid |
Read straight from the file — download or use the API URL for the full dataset.
| page=2,ocr=1 |
| 0.700 |
| valid |
| 0.700 |
| valid |