34 extractive question-and-answer pairs built from Environment Clearance Deep Draft Multipurpose berth no. 14 at New Mangalore Port 0, published by newmangaloreport.gov.in. Every answer is a verbatim span of text the source prints, and each row carries the passage it sits in, its offset in that passage, the source quote, the page and the location in the document, so any row can be checked against the original. 10 of the 34 pairs (29.4%) are explanatory questions and 24 restate a figure. 100.00% of rows pass the corpus quality gate.
Use the API URL with your free DD token in notebooks, scripts, and pipelines.
https://www.desidata.in/api/datasets/environment-clearance-for-deep-draft-multipurpose-berth-no-14-at-new-mangalore/downloadDataset downloads are free. For Python or API downloads, sign in once and create a free DD token; set it as DD_TOKEN or save it in your notebook's secrets. Requests are linked to your account so your download history and counts stay accurate.
# One-time install: pip install desidata
# Set DD_TOKEN in your environment first (create a free token in Profile & settings).
import desidata
df = desidata.load("environment-clearance-for-deep-draft-multipurpose-berth-no-14-at-new-mangalore")
df.head()Sign in with Google to download.
Usable for analysis, but expect some cleaning before you rely on it.
New Mangalore Port Authority Environment Test Reports (March 2025) - Question and Answer Dataset
Economy · 25 rows
Stevedoring and Shore Handling Policy - Question and Answer Dataset
Economy · 285 rows
Half Yearly EC Compliance Report - Question and Answer Dataset
Economy · 32 rows
New Mangalore Port Authority Environment Test Reports (October 2025) - Question and Answer Dataset
Economy · 89 rows
Annual Report 2015-16 by agriwelfare.gov.in - Question and Answer Dataset
Economy · 1,013 rows
Higher Education in India - Question and Answer Dataset
Economy · 1,594 rows
Gender Policy of NABARD - Question and Answer Dataset
Economy · 14 rows
ICAR Annual Report 2025-26 - Question and Answer Dataset
Economy · 1,101 rows
First 10 of 34 rows
| question | answer | context | answer_start | question_type | knowledge_quality_score | source_quote | source_page | source_location | confidence | validation_status |
|---|---|---|---|---|---|---|---|---|---|---|
| What is the purpose of equipping the laboratory with a marine biologist? | so that the marine water quality is regularly monitored in order to ensure that the marine life is not adversely affected | (iv) well-equipped laboratory with suitable instruments to monitor the quality of air and water shall be set up so as to ensure that the quality of ambient air and water conforms to the prescribed standards. The laboratory will also be equipped with qualified manpower including a marine biologist so that the marine water quality is regularly monitored in order to ensure that the marine life is not adversely affected as a result of implementation of the said project. The quality of ambient air and water shall be monitored periodically in all the seasons and the results should be properly maintained for inspection of the concerned pollution control agencies. The periodic monitoring reports at least once in 6 months must be sent to this Ministry (Regional Office at Bangalore ) and SPCB. | 298 | relationship | 0.970 | The laboratory will also be equipped with qualified manpower including a marine biologist so that the marine water quality is regularly monitored in order to ensure that the marine life is not adversely affected as a result of implementation of the said project. | 2 | page=2,ocr=1 | 0.700 | valid |
| What should proponents in cyclone-prone areas develop for their projects? | an emergency plan and also the ways and. means for minimizing as well as mitigating the cyclone disasters. | (ix) The mangroves, if any, on the site should not be disturbed in any way. (x) The noise generated from the generators during operation shall be minimized by providing adequate vibration damping/vibration isolation techniques. (xi) In case the proposed project falls in a cyclone prone area the proponent(s) must prepare an emergency plan and also the ways and. means for minimizing as well as mitigating the cyclone disasters. (b) General Conditions: (i) Construction of the proposed structures should be undertaken meticulously conforming to the existing Central/local rules and regulations including CRZ Notification 1991 & its amendments. All the construction designs/drawings relating to the proposed construction activities must have approvals of the concerned State Government Departments/Agencies. | 322 | list | 0.820 | (xi) In case the proposed project falls in a cyclone prone area the proponent(s) must prepare an emergency plan and also the ways and. means for minimizing as well as mitigating the cyclone disasters. (b) General Conditions: (i) Construction of the proposed structures should be undertaken meticulously conforming to the existing Central/local rules and regulations including CRZ Notification 1991 & its amendments. | ||||
| What infrastructure facilities should be provided for laborers during construction to avoid environmental damage? | water supply, fuel for cooking, sanitation etc. | (v) Adequate provisions for infrastructure facilities such as water supply, fuel for cooking, sanitation etc. must be provided for the labourers during the construction period in order to avoid damage to the environment. Colonies for the labourers should not be located in the CRZ area. It should” also be ensured that the construction workers do not cut trees, including mangroves for fuel wood purpose. (vi) To prevent discharge of sewage and other liquid wastes in to the water bodies, adequate system for collection and treatment of the wastes must be provided. No sewage and other liquid wastes without treatment should be allowed to enter into the water bodies. (vii) | The quarrying material required for the construction purpose shall be obtained only from the approved quarries/borrow areas. | 62 | list | 0.820 | (v) Adequate provisions for infrastructure facilities such as water supply, fuel for cooking, sanitation etc. must be provided for the labourers during the construction period in order to avoid damage to the environment. | 2 | page=2,ocr=1 | 0.700 | |
| What approvals must be obtained for hazardous chemical-related activities? | All approvals from State & Central nodal agencies including OISD, Chief Controller of Explosives, Chief Inspectorate of Factories | (ii) The proponent shall ensure that as a result of the proposed constructions, ingress of the saline water into the ground water does not take place. Regular monitoring should be done for this purpose at appropriate locations on the project site. (iii) Handling, manufacturing, storage and transportation of all hazardous chemicals should be carried out in accordance with MSIHC Rules, 1989 and subsequent amendments. All approvals from State & Central nodal agencies including OISD, Chief Controller of Explosives, Chief Inspectorate of Factories must be obtained. A comprehensive contingency plan in collaboration with the concerned authorities must be formulated before commissioning of the project to meet any eventuality in case of an accident. | 419 | list | 0.820 | (iii) Handling, manufacturing, storage and transportation of all hazardous chemicals should be carried out in accordance with MSIHC Rules, 1989 and subsequent amendments. All approvals from State & Central nodal agencies including OISD, Chief Controller of Explosives, Chief Inspectorate of Factories must be obtained. | 2 | |||
| What infrastructure facilities must be provided for labourers during construction? | water supply, fuel for cooking, sanitation | (v) Adequate provisions for infrastructure facilities such as water supply, fuel for cooking, sanitation etc. must be provided for the labourers during the construction period in order to avoid damage to the environment. Colonies for the labourers should not be located in the CRZ area. It should” also be ensured that the construction workers do not cut trees, including mangroves for fuel wood purpose. (vi) To prevent discharge of sewage and other liquid wastes in to the water bodies, adequate system for collection and treatment of the wastes must be provided. No sewage and other liquid wastes without treatment should be allowed to enter into the water bodies. (vii) | The quarrying material required for the construction purpose shall be obtained only from the approved quarries/borrow areas. | 62 | list | 0.820 | (v) Adequate provisions for infrastructure facilities such as water supply, fuel for cooking, sanitation etc. | 2 | page=2,ocr=1 | 0.700 | valid |
| What approvals are required for handling hazardous chemicals? | State & Central nodal agencies including OISD, Chief Controller of Explosives, Chief Inspectorate of Factories | (ii) The proponent shall ensure that as a result of the proposed constructions, ingress of the saline water into the ground water does not take place. Regular monitoring should be done for this purpose at appropriate locations on the project site. (iii) Handling, manufacturing, storage and transportation of all hazardous chemicals should be carried out in accordance with MSIHC Rules, 1989 and subsequent amendments. All approvals from State & Central nodal agencies including OISD, Chief Controller of Explosives, Chief Inspectorate of Factories must be obtained. A comprehensive contingency plan in collaboration with the concerned authorities must be formulated before commissioning of the project to meet any eventuality in case of an accident. | 438 | list | 0.820 | All approvals from State & Central nodal agencies including OISD, Chief Controller of Explosives, Chief Inspectorate of Factories must be obtained. | 2 | page=2,ocr=1 | 0.700 | valid |
| To whom must the periodic monitoring reports be sent? | this Ministry (Regional Office at Bangalore ) and SPCB | (iv) well-equipped laboratory with suitable instruments to monitor the quality of air and water shall be set up so as to ensure that the quality of ambient air and water conforms to the prescribed standards. The laboratory will also be equipped with qualified manpower including a marine biologist so that the marine water quality is regularly monitored in order to ensure that the marine life is not adversely affected as a result of implementation of the said project. The quality of ambient air and water shall be monitored periodically in all the seasons and the results should be properly maintained for inspection of the concerned pollution control agencies. The periodic monitoring reports at least once in 6 months must be sent to this Ministry (Regional Office at Bangalore ) and SPCB. | 739 | list | 0.820 | The periodic monitoring reports at least once in 6 months must be sent to this Ministry (Regional Office at Bangalore ) and SPCB. | 2 | page=2,ocr=1 | 0.700 | valid |
| What provisions must be made for labourers during the construction period? | water supply, fuel for cooking, sanitation etc. | (v) Adequate provisions for infrastructure facilities such as water supply, fuel for cooking, sanitation etc. must be provided for the labourers during the construction period in order to avoid damage to the environment. Colonies for the labourers should not be located in the CRZ area. It should” also be ensured that the construction workers do not cut trees, including mangroves for fuel wood purpose. (vi) To prevent discharge of sewage and other liquid wastes in to the water bodies, adequate system for collection and treatment of the wastes must be provided. No sewage and other liquid wastes without treatment should be allowed to enter into the water bodies. (vii) | The quarrying material required for the construction purpose shall be obtained only from the approved quarries/borrow areas. | 62 | list | 0.820 | (v) Adequate provisions for infrastructure facilities such as water supply, fuel for cooking, sanitation etc. must be provided for the labourers during the construction period in order to avoid damage to the environment. | 2 | page=2,ocr=1 | 0.700 | valid |
| What approvals must be obtained for handling hazardous chemicals? | All approvals from State & Central nodal agencies including OISD, Chief Controller of Explosives, Chief Inspectorate of Factories | (ii) The proponent shall ensure that as a result of the proposed constructions, ingress of the saline water into the ground water does not take place. Regular monitoring should be done for this purpose at appropriate locations on the project site. (iii) Handling, manufacturing, storage and transportation of all hazardous chemicals should be carried out in accordance with MSIHC Rules, 1989 and subsequent amendments. All approvals from State & Central nodal agencies including OISD, Chief Controller of Explosives, Chief Inspectorate of Factories must be obtained. A comprehensive contingency plan in collaboration with the concerned authorities must be formulated before commissioning of the project to meet any eventuality in case of an accident. | 419 | list | 0.820 | (iii) Handling, manufacturing, storage and transportation of all hazardous chemicals should be carried out in accordance with MSIHC Rules, 1989 and subsequent amendments. All approvals from State & Central nodal agencies including OISD, Chief Controller of Explosives, Chief Inspectorate of Factories must be obtained. | 2 | |||
| What infrastructure facilities must be provided for laborers during construction? | water supply, fuel for cooking, sanitation | (v) Adequate provisions for infrastructure facilities such as water supply, fuel for cooking, sanitation etc. must be provided for the labourers during the construction period in order to avoid damage to the environment. Colonies for the labourers should not be located in the CRZ area. It should” also be ensured that the construction workers do not cut trees, including mangroves for fuel wood purpose. (vi) To prevent discharge of sewage and other liquid wastes in to the water bodies, adequate system for collection and treatment of the wastes must be provided. No sewage and other liquid wastes without treatment should be allowed to enter into the water bodies. (vii) | The quarrying material required for the construction purpose shall be obtained only from the approved quarries/borrow areas. | 62 | list | 0.820 | (v) Adequate provisions for infrastructure facilities such as water supply, fuel for cooking, sanitation etc. | 2 | page=2,ocr=1 | 0.700 | valid |
Read straight from the file — download or use the API URL for the full dataset.
| 2 |
| page=2,ocr=1 |
| 0.700 |
| valid |
| valid |
| page=2,ocr=1 |
| 0.700 |
| valid |
| page=2,ocr=1 |
| 0.700 |
| valid |