| What was the Pavement designed for based on subgrade CBR conditions? | designed for subgrade CBR of 5 and 10 percent depending on the conditions existing at site | unladen weight of reach stacker as 72,040 kg. The Pavement was designed for subgrade CBR of 5 and 10 percent depending on the conditions existing at site. The suggested design thicknesses of rigid pavement and CC Block Pavement for reach stacker are given in Figs. | 63 | definition | 1.000 | The Pavement was designed for subgrade CBR of 5 and 10 percent depending on the conditions existing at site. | 36 | page=36,ocr=1 | 0.850 | valid |
| What was compared to assess speed and traffic characteristics on the corridor? | made between individual vehicle speeds and posted speed limits, and average operating speeds versus posted speed limits | 314) were conducted to assess the speed and traffic characteristics on this corridor. A comparison was made between individual vehicle speeds and posted speed limits, and average operating speeds versus posted speed limits. It was revealed that at Pillar No. | 103 | definition | 1.000 | A comparison was made between individual vehicle speeds and posted speed limits, and average operating speeds versus posted speed limits. | 86 | page=86,ocr=1 | 0.850 | valid |
| What does rock fracture mechanics help to characterize? | the rock and rock from rock material properties and fracture tough study | Rock Fracture study was carried out to understand the rock structure under compressive stress, analysis of crack propagation, tensile strength in brittle for fracture. re Process study was attempted to understand plastic process zone due » process zone due to micro- selected. by non-planar cracks surface influenced by and shear stress, crack propagation irregularity in gray boundaries and weakness, complex crack propagatie through the crack bifurcation and branching dt stages of fracture process. Rock fracture mec study helps to characterise the rock and rock from rock material properties and fracture tough study. | 548 | definition | 1.000 | Rock fracture mec study helps to characterise the rock and rock from rock material properties and fracture tough study. | 12 | page=12,ocr=1 | 0.700 | valid |
| What does the prototype equipment for compacted soil measure? | determines the penetration resistance of soil compacted to different degree of denseness | Development of Non Nuclear Density Gauge for Evaluation of Dry Density of the Compacted Fill As reported earlier, a prototype equipment (Electrical- mechanical density gauge) with a cone penetrometer was designed and fabricated. The prototype equipment determines the penetration resistance of soil compacted to different degree of denseness. First model of this equipment is now ready and a patent has been filed with CSIR, Engineering of Disaster Mitigation Health Monitoring for Safe & Smart B Environment (EDMISSIBLE) - 12" Five Plan Network Project (Nodal Labor CBRI) Under this project, Task entitled ‘Landslid information system and design of for landslide control’ has been taken landslide, known as Maithana_ landslide Fig. 7, which is located at km 423. Highway- 58, 4 Km ahead fror | 253 | definition | 1.000 | The prototype equipment determines the penetration resistance of soil compacted to different degree of denseness. | 12 | page=12,ocr=1 | 0.700 | valid |
| What was the goal of the program designed for selected youths? | to broaden their repertoire of cognitive and behavioural skills for effective management of emotions | The program provided an opportunity to the selected youths to broaden their repertoire of cognitive and behavioural skills for effective management of emotions which influence two wheeler riding behaviours. Majority of the participants reported riding a two wheeler almost daily or at least a few days in a week (73 per cent). A substantial proportion reported pillion riding at least a few times in a week (36 per cent), Seventy nine participants across the three venues formed the intervention sample while 40 participants from one nue formed the control group sample. In the feedback orms, a large proportion of the participants (64 per cent) they have learnt about strategies to calm down. | 59 | definition | 1.000 | The program provided an opportunity to the selected youths to broaden their repertoire of cognitive and behavioural skills for effective management of emotions which influence two wheeler riding behaviours. | 61 | page=61,ocr=1 | 0.700 | valid |
| What is the objective of WP 2 in the transportation module? | Guidelines to Design feeder system lead to sustainable PT | WP 2: Development of Feeder Transport System and Parking Facilities at Public Transport Terminals > Objectives * Guidelines to Design feeder system lead to sustainable PT ** Guidelines to Design parking information system for different vehicles at Public Transport Terminals > Progress ** Questionnaires and proformas for pilot survey at Nehru Place and Moolchand Metro Stations * Data Collection at Moolchand and Nehru Place Metro Station: Metro Passengers, IPT/NMT Passenger, IPT/NMT Operator, Private Vehicle Commuter, Feeder Bus Passenger, Feeder Bus Operator Interview: Total Sample Size is 1487 Passenger Counts, Counts, Terminal Passenger Terminal Classified vehicle Counts and Occupancy Survey Metro Station at WP 3: Design of Advanced Public Transport Information Systems using ITS Technologies > Objectives “Guidelines to Design Advanced Public Transport Information Systems (APTS) using ITS technologies > Progress ** Design of Survey proforma for evaluation ** Progress (Bus Network and Metro Network) CSIR CRRI ROUTE FINDER ABOUT US Select Timing SHORTE Origin : Destination : Find Route * Stations marked in RED are Junctios Your best metro travel route SEARCH ST ROUTE FINDER FOR METRO FEEDBACK | 113 | definition | 1.000 |
| What is the objective of the traffic study mentioned? | to conduct appropriate traffic studies to quantify the traffic problems and traffic characteristics at identified intersections | The objectives of the study is to conduct appropriate traffic studies to quantify the traffic problems and traffic characteristics at identified intersections, estimation of future traffic and its distribution at peak hours for each intersection for the next 10 years and preparation of typical junction improvement plans for identified junctions. The scope of the study is limited to conduct traffic surveys and preparation of junction improvement plans for 16 identified intersections based on traffic projection for next 10 years as per IRC guidelines. Various field studies includes road inventory and traffic studies were carried out to collect the primary data to understand the existing problems and to analyze traffic demand. | 31 | definition | 1.000 | The objectives of the study is to conduct appropriate traffic studies to quantify the traffic problems and traffic characteristics at identified intersections, estimation of future traffic and its distribution at peak hours for each intersection for the next 10 years and preparation of typical junction improvement plans for identified junctions. | 88 |
| What is the purpose of the CRRI Outstanding Performance Award Scheme? | to appreciate efforts made by a division and also to promote healthy competition amongst various divisions | monthly basis so that performance: working of the Institute could be made more Evaluation Activities CRRI Outstanding Performance Award Scheme The Institute, in order to appreciate efforts made by a division and also to promote healthy competition amongst various divisions to do better each time, initiated the practice of giving awards in various categories. The activities related to this scheme have been handled by the division. RC Secretariat During the Year, the division has provided information’ data tor Agenda, Information tor Action taken Report, for Presentation and other related logistics tor conducting of meeting. Miscellaneous Projects’ Summary for Management Council’ Research Council Responsible for preparing the up-to-date Projects’ summary and providing the information on projects that are to be ratified by the Management Council. | 167 | definition | 1.000 | monthly basis so that performance: working of the Institute could be made more Evaluation Activities CRRI Outstanding Performance Award Scheme The Institute, in order to appreciate efforts made by a division and also to promote healthy competition amongst various divisions to do better each time, initiated the practice of giving awards in various categories. |
| What is the purpose of a Technology Management Action Plan (TMAP)? | for systematic handling of a technological | Major activities carried out during 2013-2014 are as follows: Technology Management Activities 1. Technology Management Plans TECH-D initiative was launched to discover and project technologies out of the work both carried out and being carried out by the Institute. For each technology, a Technology Management Action Plan (T MAP) is for systematic handling of a technological 2. Technology Transfer Technology Transfer on “Different Types of Cold Mix Technology for Construction and Maintenance of Road for Eastern States viz, West Bengal, Bihar, Odisha, Chattisgarh, Jharkhand and Madhya Pradesh” to M/s Bitchem Asphalt Technologies Limited, Guwahati on exclusive license term for a period of five years. ll. | 335 | definition | 1.000 | For each technology, a Technology Management Action Plan (T MAP) is for systematic handling of a technological 2. | 95 | page=95,ocr=1 | 0.700 | valid |
| What is the purpose of human resource development in an organization? | to upgrade the capabilities and professional skills of the personnel working in an organization to match the changing work demands | Quality Control and Quality Assurance for Roads and Bridges On request of PWD, Govt. of Uttarakhand, CRRI organized a training programme on “Quality Control and Quality Assurance for Roads and Bridges” for the young engineers of PWD at Dehradun from February 10-11, 2014. Human Resource Development Programme Human resource development is a philosophy of managementandis purported to upgrade the capabilities and professional skills of the personnel working in an organization to match the changing work demands. To enhance the professional capabilities of scientists and scientific staff for undertaking the R&D work in frontline areas of highway engineering and with the urge to develop technologies which have competitive edge and marketable strength, CRRI has been devoted in human resources development. | 381 | definition | 1.000 | Human Resource Development Programme Human resource development is a philosophy of managementandis purported to upgrade the capabilities and professional skills of the personnel working in an organization to match the changing work demands. | 99 |