225 extractive question-and-answer pairs built from New Doc 2018-05-29, published by crridom.gov.in. Every answer is a verbatim span of text the source prints, and each row carries the passage it sits in, its offset in that passage, the source quote, the page and the location in the document, so any row can be checked against the original. 153 of the 225 pairs (68.0%) are explanatory questions and 72 restate a figure. 100.00% of rows pass the corpus quality gate.
Use the API URL with your free DD token in notebooks, scripts, and pipelines.
https://www.desidata.in/api/datasets/crri-annual-report-2012-13-question-and-answer-dataset/downloadDataset downloads are free. For Python or API downloads, sign in once and create a free DD token; set it as DD_TOKEN or save it in your notebook's secrets. Requests are linked to your account so your download history and counts stay accurate.
# One-time install: pip install desidata
# Set DD_TOKEN in your environment first (create a free token in Profile & settings).
import desidata
df = desidata.load("crri-annual-report-2012-13-question-and-answer-dataset")
df.head()Sign in with Google to download.
Usable for analysis, but expect some cleaning before you rely on it.
Annual Report 2015-16 by agriwelfare.gov.in - Question and Answer Dataset
Economy · 1,013 rows
Higher Education in India - Question and Answer Dataset
Economy · 1,594 rows
Gender Policy of NABARD - Question and Answer Dataset
Economy · 14 rows
ICAR Annual Report 2025-26 - Question and Answer Dataset
Economy · 1,101 rows
First 10 of 225 rows
| question | answer | context | answer_start | question_type | knowledge_quality_score | source_quote | source_page | source_location | confidence | validation_status |
|---|---|---|---|---|---|---|---|---|---|---|
| What type of initiative is the ERP system described as? | an organizational transformation initiative undertaken | A Conterence on Road and Technologies tor the North East Region (CORTNE 2013) was organised, ERP Implementation CSIR has taken a very ambitious project to implement a comprehensive Resource Planning system. The ERP system is an organizational transformation initiative undertaken | 225 | definition | 1.000 | The ERP system is an organizational transformation initiative undertaken | 111 | page=111,ocr=1 | 0.850 | valid |
| What does the prototype equipment with a cone measure? | determines the penetration resistance of soil compacted to different degree of densaness | fig mode! for Development of Won Nuclear Density Gauge for Evaluation of Dry Density of Compacted Fill A prototype equipment density gaugel with a cone has been designed and fabricated, The prototype determines the penetration resistance of soil compacted to different degree of densaness, Laboratory studies tor its reliability and repeatability are in prograss. For studying its efficacy, Delhi soil was compacted at different moisture contents to different densitias in the CBA mould and the penetration resistance was avaluated, The data is being analysed to develop calibration charts. | 200 | definition | 1.000 | fig mode! for Development of Won Nuclear Density Gauge for Evaluation of Dry Density of Compacted Fill A prototype equipment density gaugel with a cone has been designed and fabricated, The prototype determines the penetration resistance of soil compacted to different degree of densaness, Laboratory studies tor its reliability and repeatability are in prograss. | 14 | page=14,ocr=1 | 0.700 | valid |
| What is the byproduct of zinc ore extraction through hydrometallurgy called? | waste matetial produced during extraction of zinc ore concentrate by hydrometatlurgy operation | certain restoration works had already been undertaken by MES authorities, additional remedial measures like soil nailing, longitudinal and transverse drains, dental concreting and Vegetation on sloping surface were Suggested, Experimental Test Track Construction Using Jarofix Waste Material Jarosite is waste matetial produced during extraction of zinc ore concentrate by hydrometatlurgy operation, When it is mixed with 2 per cent lime and 10 per cent cement, the resulting stable material is called Jarofix. For investigating performance of road embankment and subgrade constructed using Jarofix, this project was taken up at the request of Hindustan Zine Ltd, Chanderia, Chttorgarh, Rajasthan, The experimental test track construction of road using Jarofix was carried out at Mungana Village, 40 km from Chittoragarh, Rajasthan on Udaipur-Chittorgrah State Highway. | 304 | definition | 1.000 | certain restoration works had already been undertaken by MES authorities, additional remedial measures like soil nailing, longitudinal and transverse drains, dental concreting and Vegetation on sloping surface were Suggested, Experimental Test Track Construction Using Jarofix Waste Material Jarosite is waste matetial produced during extraction of zinc ore concentrate by hydrometatlurgy operation, When it is mixed with 2 per cent lime and 10 per cent cement, the resulting stable material is called Jarofix. | ||||
| What is the function of the Geosynthetic Pullout Test Apparatus? | determining the interfacial friction between reinforcement (GI Strips, Geosynthetics, etc) and backfill soil | Geasynthetic Pullout Test Apparatus is used far determining the interfacial friction between reinforcement (GI Strips, Geosynthetics, etc) and backfill soil (Fig.15). These results are very vital for safe and economical design of mechanically stabilised soil structures (reinforced earth walls and slopes). In this apparatus, geosynthetic material i embedded between two layers ot soil. For conducting the pullout test, normal compressive stress is applied to the top soil layer and magnitude of force raquired to pull the peosynthetic out of the soil is recorded. Pullout resistance is obtained by dividing the maximum load by the test specimen width. A plot of maximum pullout resistance versus applied 15 out Test normal stress ts obtained by a of such tests. | 48 | definition | 1.000 | Geasynthetic Pullout Test Apparatus is used far determining the interfacial friction between reinforcement (GI Strips, Geosynthetics, etc) and backfill soil (Fig.15). | 24 | page=24,ocr=1 | 0.700 | valid |
| What is the purpose of the Road Bond patch mix? | repair and maintenance of bituminous roads specially for filma of and utility cuts | The Road Bond patch mix is found 2s ready-made mux for repair and maintenance of bituminous roads specially for filma of and utility cuts, various properties of the mix such as stability, bond strength susceptibility and retained stability have been {ound satisfactory and meeting the requirement as per the available specifications. vestigations for Providing on Main Road from Sec. 71, 72, 51,52 Xing to Sector 121,122 Irrigation Pusta, Noida The road from sector 71-52 of Noida caters to the need af local traffic including primarily main Road and other important places such 35 residential shopping complexes and construction materials supplying activities centres etc. | 55 | definition | 1.000 | The Road Bond patch mix is found 2s ready-made mux for repair and maintenance of bituminous roads specially for filma of and utility cuts, various properties of the mix such as stability, bond strength susceptibility and retained stability have been {ound satisfactory and meeting the requirement as per the available specifications. | 32 | page=32,ocr=1 | 0.700 | |
| What is the function of the Porto Clinic apparatus? | testing operators for visual acuity, blindness, depth perception, horizontal field lest and phoria tests | Porta Clinic 4nd Porto Glare were used to Measure all the Tests, these two SEMI based hence results are objective Porto Clinic tt 'S portable apparatus for testing operators for visual acuity, blindness, depth perception, horizontal field lest and phoria tests in this test. the has to read the chart or numbers, followed by the Ishihara colour blindness test where the driver has to identify the correct number the chart (Fig.?1), 10 understand the time taken by the driver to these activities. As such ho time lemits are set for these tests depth perception, acwty, colour Fig. Testing | 156 | definition | 1.000 | Porta Clinic 4nd Porto Glare were used to Measure all the Tests, these two SEMI based hence results are objective Porto Clinic tt 'S portable apparatus for testing operators for visual acuity, blindness, depth perception, horizontal field lest and phoria tests in this test. | 71 | page=71,ocr=1 | 0.700 | valid |
| What was the main goal of the traffic study for major road corridors in Ahmedabad? | to conduct appropriate traffic to quantity the traffic problems and traffic charactenstics at intersections | Trottic Studies for Junction of Major Rood Corridors in Ahmedabad The objectives of the project is to conduct appropriate traffic to quantity the traffic problems and traffic charactenstics at intersections. Estimation af future traffic and ts distribution at peak hours for each for the next years and of typical junction tor identified junctions. | 99 | definition | 1.000 | Trottic Studies for Junction of Major Rood Corridors in Ahmedabad The objectives of the project is to conduct appropriate traffic to quantity the traffic problems and traffic charactenstics at intersections. | 98 | page=98,ocr=1 | 0.700 | valid |
| What is the goal of creating the CSIR Accident Recording Portal? | to develop portal to Record a new accident | Management and « Vil. by CSIR 10 focus electronic workplaces, nurturing and grooming talent and re-engineenng processes for augmented service delivery The role of TMBD Division to implement it nn CSIR Accident Recording Portal At various forums, a need was fell to develop portal to Record a new accident. Accordingly work has Deen started to develop the portal with (he objective Check Accident Statistic Participate in Discussron Create/view information Resources Recorded accidents are by the portal and a report is generated Report is utilised by the concerned authority that check for the prime reasons of the Accident. Authority takes corrective action to avoid future accidents thus saving many ives. The Portal has baen module and can be accessed yy 4, % ori) Vil. Road Transport y Network At forums, a Neng develop & network fe HONS | R&D organisations a! | 262 | definition | 1.000 | by CSIR 10 focus electronic workplaces, nurturing and grooming talent and re-engineenng processes for augmented service delivery The role of TMBD Division to implement it nn CSIR Accident Recording Portal At various forums, a need was fell to develop portal to Record a new accident. | 112 | |||
| What was the primary purpose of roughness measurements on roads? | to assess the nding quality of roads, which gets affected mainly by the condition of pavement surface | Figs.42 to 44 show the typa and extent of distresses observed on some of the project roads. General viow of Vinay mary view of loss of an Pr. Line Shanhar mary > aa” ) ees Fig. A view of sorface on Avenue Pavement surface on different roads, was measured by using (Fig.45), @ high speed road roughness measuring device developed by Australian Road Research Board Ltd. Roughness measurements were undertaken with a view to assess the nding quality of roads, which gets affected mainly by the condition of pavement surface. Roughness measurements, using were undertaken along two wheel paths. Data pertaining to assessment of existing condition and riding quality measurements for forty one roads was collected through field evaluation. The data was processed, analyzed and applied in making towards remedial | resurfacing treatments for improving upon their current condition. | 419 | definition | 1.000 | Roughness measurements were undertaken with a view to assess the nding quality of roads, which gets affected mainly by the condition of pavement surface. | 49 | page=49,ocr=1 | ||
| What is the name of the system used for measuring road roughness? | Axle Mounted System for Measuring Road Roughness | No. 50474) * in or relating to Pitch Mastic Composition (two patent No. 92526 and 95305) * for the Traatmant of Styrene Pitch (Pat No. 96710) in or relating to the manufacture af Mixture (Pat No. 90470} * in or Relating to the Manufacture of Reactive Surkhi (Pat No, 93276) * Testing Machine (Pat No, 11142) * Unevenness (two patent No, 121776 & 121777) * for Checking Pavernent Unevenness No, 121114) * Automatec Road Unevanness Recorder (three Pat No, 140517, 146572, 146543) * Rotiller (developed jointly by MERADO & * Pavement Paint Marking Machine (developed jointly hy CMERI Durgapur and CARI) Vertical Profile Meter Polymer modified SBS Modified bitumen Crum Rubber Modified Bitumen Waste Plastic Modified Bitumen Axle Mounted System for Measuring Road Roughness * A Device tor Sensing and Measuring Moisture in Soil and Other Porous Materials (Pat No. 173089) Buick Cat * A Process tor the Production af Magnesium Phosphate Cement for Emergency Repair of A New Paving system for Electronic Probe Process know-how for Construction a! | 721 | definition | 1.000 | 90470} * in or Relating to the Manufacture of Reactive Surkhi (Pat No, 93276) * Testing Machine (Pat No, 11142) * Unevenness (two patent No, 121776 & 121777) * for Checking Pavernent Unevenness No, 121114) * Automatec Road Unevanness Recorder (three Pat No, 140517, 146572, 146543) * Rotiller (developed jointly by MERADO & * Pavement Paint Marking Machine (developed jointly hy CMERI Durgapur and CARI) Vertical Profile Meter Polymer modified SBS Modified bitumen Crum Rubber Modified Bitumen Waste Plastic Modified Bitumen Axle Mounted System for Measuring Road Roughness * A Device tor Sensing |
Read straight from the file — download or use the API URL for the full dataset.
| 17 |
| page=17,ocr=1 |
| 0.700 |
| valid |
| valid |
| page=112,ocr=1 |
| 0.700 |
| valid |
| 0.700 |
| valid |
| 172 |
| page=172,ocr=1 |
| 0.700 |
| valid |