69 extractive question-and-answer pairs built from Compliance Report, published by newmangaloreport.gov.in. Every answer is a verbatim span of text the source prints, and each row carries the passage it sits in, its offset in that passage, the source quote, the page and the location in the document, so any row can be checked against the original. 42 of the 69 pairs (60.9%) are explanatory questions and 27 restate a figure. 95.65% of rows pass the corpus quality gate.
Use the API URL with your free DD token in notebooks, scripts, and pipelines.
https://www.desidata.in/api/datasets/compliance-report-by-new-mangalore-port-authority-question-and-answer-dataset/downloadDataset downloads are free. For Python or API downloads, sign in once and create a free DD token; set it as DD_TOKEN or save it in your notebook's secrets. Requests are linked to your account so your download history and counts stay accurate.
# One-time install: pip install desidata
# Set DD_TOKEN in your environment first (create a free token in Profile & settings).
import desidata
df = desidata.load("compliance-report-by-new-mangalore-port-authority-question-and-answer-dataset")
df.head()Sign in with Google to download.
Usable for analysis, but expect some cleaning before you rely on it.
New Mangalore Port Authority Environment Test Reports (March 2025) - Question and Answer Dataset
Economy · 25 rows
Stevedoring and Shore Handling Policy - Question and Answer Dataset
Economy · 285 rows
Half Yearly EC Compliance Report - Question and Answer Dataset
Economy · 32 rows
New Mangalore Port Authority Environment Test Reports (October 2025) - Question and Answer Dataset
Economy · 89 rows
Annual Report 2015-16 by agriwelfare.gov.in - Question and Answer Dataset
Economy · 1,013 rows
Higher Education in India - Question and Answer Dataset
Economy · 1,594 rows
Gender Policy of NABARD - Question and Answer Dataset
Economy · 14 rows
ICAR Annual Report 2025-26 - Question and Answer Dataset
Economy · 1,101 rows
First 10 of 69 rows
| question | answer | context | answer_start | question_type | knowledge_quality_score | source_quote | source_page | source_location | confidence | validation_status |
|---|---|---|---|---|---|---|---|---|---|---|
| What is ensured during the execution of the project within the security compound of the operating port? | no displacement of people, houses or fishing activity during the course of execution of the project | The Project is taken up within the security compound of the operating Port. Hence there is no displacement of people, houses or fishing activity during the course of execution of the project. It shall be ensured that there is no displacement of people, houses or fishing activity as a result of the project. | 91 | definition | 1.000 | Hence there is no displacement of people, houses or fishing activity during the course of execution of the project. | 5 | page=5,ocr=1 | 0.850 | valid |
| What kind of monitoring system is required for air and water pollution? | Automatic / online monitoring system (24 x 7) | Automatic / online monitoring system (24 x 7) monitoring devices for air pollution as well as water pollution in respect of flow measurement and relevant pollutants in the treatment system shall be installed. The data should be made available to the respective SPCB and in the Company’s website. Regular Air & Water quality sample testing shall be conducted till the Installation of Online monitoring system 24X7 and all efforts are made to install it in time frame of Flow measurement is installed for relevant Water pollution pollutants in the treatment system. All the recommendations mentioned in the rapid risk assessment report, disaster management plan and safety guidelines shall be implemented. All other conditions will remain unchanged. Implemented pUTY MANAGER ion Cone" Environment Protection And Pollution Port Authority New Mangalore Me ore — | 0 | definition | 1.000 | Automatic / online monitoring system (24 x 7) monitoring devices for air pollution as well as water pollution in respect of flow measurement and relevant pollutants in the treatment system shall be installed. | 9 | page=9,ocr=1 | 0.700 | |
| What type of monitoring system is required for air and water pollution? | Automatic / online monitoring system (24 x 7) | Automatic / online monitoring system (24 x 7) monitoring devices for air pollution as well as water pollution in respect of flow measurement and relevant pollutants in the treatment system shall be installed. The data should be made available to the respective SPCB and in the Company’s website. Regular Air & Water quality sample testing shall be conducted till the Installation of Online monitoring system 24X7 and all efforts are made to install it in time frame of Flow measurement is installed for relevant Water pollution pollutants in the treatment system. All the recommendations mentioned in the rapid risk assessment report, disaster management plan and safety guidelines shall be implemented. All other conditions will remain unchanged. Implemented pUTY MANAGER ion Cone" Environment Protection And Pollution Port Authority New Mangalore Me ore — | 0 | definition | 1.000 | Automatic / online monitoring system (24 x 7) monitoring devices for air pollution as well as water pollution in respect of flow measurement and relevant pollutants in the treatment system shall be installed. | 9 | page=9,ocr=1 | 0.700 | |
| What are Butterflies? | the indicators of best ecological system | The relentless efforts taken by the Management has ushered the growth of butterflies also. Butterflies are the indicators of best ecological system. New Mangalore Port Authority houses immovable butterflies. | 107 | definition | 0.980 | Butterflies are the indicators of best ecological system. | 12 | page=12,ocr=1 | 0.850 | valid |
| What is New Mangalore Port Authority? | the only Port in the country that maintain the best ecological balance in the midst of its business activity without compromising its Environment | At present, New Mangalore Port Authority is the only Port in the country that maintain the best ecological balance in the midst of its business activity without compromising its Environment. The presence of beautiful garden and parks indicate the maturity of civilized society. | 44 | definition | 0.980 | New Mangalore Port Authority is the only Port in the country that maintain the best ecological balance in the midst of its business activity without compromising its Environment. | 12 | page=12,ocr=1 | 0.850 | valid |
| What is monitoring process? | carried out through NABL accrediated established laboratories having resources and spare capacity | Annexure -IV Environmental Monitoring System: There is a scientific monitoring system in place in the Port. The monitoring process is carried out through NABL accrediated established laboratories having resources and spare capacity. NMPA monitors air and water qualities through third pary authorised from KSPCB, MOEF&CC, regularly and taken both preventive and corrective actions. | 134 | definition | 0.980 | The monitoring process is carried out through NABL accrediated established laboratories having resources and spare capacity. | 18 | page=18,ocr=1 | 0.850 | valid |
| What measure ensures that fishing activities remain unaffected during the project execution? | The Project is taken up within the security compound of the operating Port | 19/SEP/2011 Development of 4 berths in the western dock arm No. “Consent for Establishment” shall be obtained | Obtained. Valid up to 5 year from from State Pollution Control Board under Air | 23/05/2014, and Water Act and a copy shall be submitted to the Ministry before start of any construction work at the site. The authenticate map of the HTL/LTL together with their respective coordinates at discrete intervals shall be submitted so as to identify them later on the ground if and when necessary. Submitted to MOEF on 08.12. The project shall be executed in such a manner that there shall not be any disturbance to the fishing activity. The Project is taken up within the security compound of the operating Port. Hence the fishing activity is not affected during the course of execution of the project. The Project is taken up within the security compound of the operating Port. | 642 | relationship | 0.970 | The project shall be executed in such a manner that there shall not be any disturbance to the fishing activity. The Project is taken up within the security compound of the operating Port. | 5 | |||
| What kind of support must the project proponent extend to the Ministry officers during inspections? | furnishing full details and action plan including action taken reports | Full support shall be extended to the officers of this Ministry/Regional Office at Bangaluru by the project proponent during inspection of the project for monitoring purposes by furnishing full details and action plan including action taken reports in respect of mitigation measures and other environmental protection activities. Full support and cooperation will be extended to the officers of Ministry/Regional Office. | 178 | relationship | 0.970 | Full support shall be extended to the officers of this Ministry/Regional Office at Bangaluru by the project proponent during inspection of the project for monitoring purposes by furnishing full details and action plan including action taken reports in respect of mitigation measures and other environmental protection activities. | 6 | page=6,ocr=1 | 0.700 | valid |
| What is the purpose of the sprinklers installed in the coal yards? | settles the dust generated from the coal stacks during operations | Mechanized Sprinkling System: Sprinkling system inside the Port was the brain child of Inhouse Engineers. All most all the concrete roads inside the Port Have been installed with mechanised sprinklers on either side of the road. It operates every 30 minutes. This system ensures minimizing dust pollution in cargo opertional areas. The water used for this system is partly out of treated sewage water and partly from rain harvesting. This system is Complementary to the “Tank sprinkling” system. The sprinkling system is also provided in Railway Marshalling Yard to prevent / arrest the dust suppressed during the loading and unloading time. Sprinkling system Yard Sprinkler System:-Sprinklers are installed: in the coal yards which 180 degrees and cover the entire coal stacks. This completely settles the dust generated from the coal stacks during operations. | 795 | relationship | 0.970 | This completely settles the dust generated from the coal stacks during operations. | 16 | page=16,ocr=1 | 0.700 | valid |
| How does the sprinkler mechanism minimize water usage? | Switch Off and Switch On for the predetermined time cycle automatically throughout the process | The mechanism gives aid to effective usage of water. The Sprinklers will Switch Off and Switch On for the predetermined time cycle automatically throughout the process thus minimizing water usage. The water will be recycled & reused for the same purpose after sediment seperation. | 73 | relationship | 0.970 | The Sprinklers will Switch Off and Switch On for the predetermined time cycle automatically throughout the process thus minimizing water usage. | 16 | page=16,ocr=1 | 0.700 | valid |
Read straight from the file — download or use the API URL for the full dataset.
| valid |
| valid |
| page=5,ocr=1 |
| 0.700 |
| valid |